Council

Tuesday 24 May 2022 at 10.30am

 

 

AGENDA

 


Council Meeting

24 May 2022

Northland Regional Council Agenda

 

Meeting to be held in the Council Chamber

36 Water Street, Whangārei

on Tuesday 24 May 2022, commencing at 10.30am

 

Recommendations contained in the council agenda are NOT council decisions. Please refer to council minutes for resolutions.

 

RĪMITI (Item)                                                                                                                                                                 Page

1.0       Ngā Mahi Whakapai (Housekeeping)

Key Health and Safety points to note:

·         If the fire alarm goes off – exit down the stairwell to the assembly point which is the visitor carpark.

·         Earthquakes – drop, cover and hold

·         Visitors please make sure you have signed in at reception, and that you sign out when you leave. Please wear your name sticker.

·         The toilets are on the opposite side of the stairwell.

·         Please adhere to the recommended Covid alert guidance that applies.

2.0       Karakia Timatanga – Tauāki ā roto (Opening karakia)

3.0       Ngā Whakapahā (apologies)

4.0       Ngā Whakapuakanga (DECLARATIONS OF CONFLICTS OF INTEREST)

5.0       Ngā Whakaae Miniti me te Mahere Mahi (Council Minutes and Action Sheet)

5.1       Confirmation of Minutes - Council Meeting 26 April 2022                                                          6

6.0       Ngā Ripoata Putea (Financial Reports)

6.1       Financial Report to 30 April 2022                                                                                                        16

6.2       Regional Rates Collection - update to 31 March 2022                                                                21

7.0       Ngā Take (Decision Making Matters)

7.1       Regional Projects Reserve: Criteria and procedures for the allocation of funding           25

7.2       Fund Manager Withdrawal                                                                                                                    30

7.3       Regional Software Holdings Limited - Reporting and 2023-2025 Statement of Intent    33

7.4       Poplar and Willow Nursery Expansion                                                                                              82

8.0       Ngā Ripoata Mahi (Operational Reports)

8.1       Chair's Report to Council                                                                                                                        87

8.2       Chief Executive’s Report to Council                                                                                                    88

8.3       Reporting on Long Term Plan 2021-2031 performance measures for quarter three of the 2021/22 year                                                                                                                                                              120

9.0       Receipt of Committee Minutes and Working Party/Group Updates

9.1       Receipt of Committee Minutes                                                                                                          122

9.2       Working Party Updates and Chairpersons' Briefings                                                                 131

9.3       Taumarere Flood Management Working Group Update                                                         133

10.0    Kaupapa ā Roto (Business with the Public Excluded)                                                           134

10.1    Confirmation of Confidential Minutes - Council Meeting 26 April 2022

10.2    Receipt of Committee CONFIDENTIAL Minutes   


 

ACC - Accident Compensation Corporation

ALGIM - Association of Local Government Information Management

AMA - Aquaculture Management Area

AMP - Asset Management Plan/Activity Management Plan

AP - Annual Plan

BOI - Bay of Islands

BOPRC - Bay of Plenty Regional Council

CAPEX - Capital Expenditure (budget to purchase assets)

CBEC - Community, Business and Environment Centre

CCO – Council Controlled Organisation

CCTO – Council Controlled Trading Organisation

CDEM - Civil Defence Emergency Management

CEEF – Chief Executives Environment Forum

CEG - Co-ordinating Executive Group

CEO - Chief Executive Officer

CIMS - Co-ordinated Incident Management System (emergency management structure)

CMA - Coastal Marine Area

CPCA - Community Pest Control Areas

CRI - Crown Research Institute

DHB - District Health Board 

DOC - Department of Conservation

DP – District Plan

E350 – Extension 350 programme

ECA - Environmental Curriculum Award

ECAN - Environment Canterbury

EECA - Energy Efficiency Conservation Authority

EF - Environment Fund

EMA - Employers and Manufacturers Association

EOC - Emergency Operations Centre

EPA - Environmental Protection Authority

ETS - Emissions Trading Scheme

FDE - Farm Dairy Effluent

FNDC - Far North District Council

FNHL - Far North Holdings Limited

FPP - First Past the Post

GE - Genetic Engineering

GIS - Geographic Information System

GMO - Genetically Modified Organism

HBRC - Hawke's Bay Regional Council

HEMP - Hapū Environmental Management Plan

Horizons - Brand name of Manawatu-Wanganui Regional Council

HR - Human Resources

HSNO - Hazardous Substances & New Organisms Act 

HSWA - Health and Safety at Work Act 2015

IEMP - Iwi Environmental Management Plan

ILGACE - Iwi and Local Government Chief Executives Forum

IPPC - Invited Private Plan Change

IRIS - Integrated Regional Information System

KDC - Kaipara District Council 

KPI - Key Performance Indicator

LAWA – Land, Air, Water Aotearoa

LEA - Local Electoral Act 2001

LGA - Local Government Act 2002

LGNZ - Local Government New Zealand

LGOIMA - Local Government Official Information & Meetings Act 1987

LIDAR – Light detection and ranging

LTI – Long time injury

LTP - Long Term Plan

MBIE – Ministry of Business, Innovation & Employment

MFE - Ministry for the Environment

MFL – Māori Freehold Land 

MHWS - Mean High Water Springs

MMH - Marsden Maritime Holdings Limited

MNZ - Maritime New Zealand

MOH - Ministry of Health

MOT - Ministry of Transport

MPI - Ministry for Primary Industries

MSD - Ministry of Social Development

NCMC - National Crisis Management Centre

NDHB - Northland District Health Board

NEMA – National Emergency Management Agency

NES - National Environmental Standards

NFT – Northland Forward Together

NGO - Non-Governmental Organisation

NIF - Northland Intersectoral Forum

NINC - Northland Inc. Limited

NIWA - National Institute of Water and Atmosphere

NORTEG - Northland Technical Advisory Group

NPS - National Policy Statement

NZCPS - New Zealand Coastal Policy Statement

NZRC - New Zealand Refining Company (Marsden Point)

NZTA – Waka Kotahi New Zealand Transport Agency

NZTE - New Zealand Trade and Enterprise

NZWWA - New Zealand Water and Wastes Association

OFI - Opportunity for Improvement\

OPEX – Operating Expenditures

OSH - Occupational Safety & Health

OTS – Office of Treaty Settlements

PCBU - Person Conducting Business or Undertaking

PGF – Provincial Growth Fund

PPE - Personal Protective Equipment

RAP - Response Action Plan

RBI - Regional Broadband Initiative

RCP - Regional Coastal Plan

RFI - Request for Information

RFP - Request for Proposal

RLTP - Regional Land Transport Plan

RMA - Resource Management Act 1991

RMG - Resource Managers Group (Regional Councils)

RMZ - Riparian Management Zone

ROI - Return on Investment

RP – Regional Plan

RPMP - Regional Pest Management Plan

RPMS - Regional Pest Management Strategy

RPS - Regional Policy Statement

RPTP – Regional Public Transport Plan

RRSAP – Regional Road Safety Action Plan

RSG – Regional Sector Group

RSHL - Regional Software Holdings Ltd

RTC - Regional Transport Committee

RTO - Regional Tourism Organisation

SIG – Special Interest Group

SIPO - Statement of Investment Policy and Objectives

SITREP - Situation Report

SOE - State of Environment (or) State Owned Enterprise

SOI – Statement of Intent

SOLGM - Society of Local Government Managers

STV - Single Transferable Vote

TAG - Technical Advisory Group

Tier 1 - Site level plan or response for an oil spill

Tier 2 - Regional level plan or response to an oil spill

Tier 3 - National level plan or response to an oil spill

TLA - Territorial Local Authority – City & District Councils

TON – Top of the North (regions)

TTMAC – Te Taitokerau Māori and Council Working Party

TTNEAP – Tai Tokerau Northland Economic Action Plan

TMP - Treasury Management Plan

TOR - Terms of Reference

TPK - Te Puni Kōkiri (Ministry of Maori Development)

TUANZ - Telecommunications Users Association of NZ

UNISA - Upper North Island Strategic Alliance

WDC - Whangarei District Council

WHHIF - Whangarei Harbour Health Improvement Fund

WRC - Waikato Regional Council

WSMP - Workplace Safety Management Practices

 

 

 



Council Meeting                                                                                                                                                         item: 5.1

24 May 2022

 

TITLE:

Confirmation of Minutes - Council Meeting 26 April 2022

From:

Chris Taylor, Governance Specialist

Authorised by:

Chris Taylor, Governance Specialist, on 17 May 2022

 

Ngā mahi tūtohutia / Recommendation

That the minutes of the council meeting held on 26 April 2022 be confirmed as a true and correct record.

 

Attachments/Ngā tapirihanga

Attachment 1: Minutes of the council meeting - 26 April 2022   


Council Meeting  ITEM: 5.1

24 May 2022Attachment 1

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator


Council Meeting                                                                                                                                                         item: 6.1

24 May 2022

 

TITLE:

Financial Report to 30 April 2022

From:

Vincent McColl, Financial Accountant and Taka Skipworth, Financial Accountant

Authorised by Group Manager/s:

Bruce Howse, Pou Taumatua – Group Manager Corporate Services, on 18 May 2022

 

Whakarāpopototanga / Executive summary

This report is to inform council of the year to date (YTD) financial result to April 2022. Council has achieved a YTD surplus after transfers to and from reserves of $6.9M, which is $1.5M favourable to budget (March YTD per agenda $1.3M).  No gains have been accrued for April as it is expected to have little movement in either gains or losses for the majority of fund managers. An update on fund performance to the end of April will be provided to the May council meeting if available.

 

Ngā mahi tūtohutia / Recommendation

That the report ‘Financial Report to 30 April 2022’ by Vincent McColl, Financial Accountant and Taka Skipworth, Financial Accountant and dated 9 May 2022, be received.

 

Background/Tuhinga

  

 

 


 

 

Revenue

Year to date revenue is $56.7M, which is ($584K) or (1%) below budget.

 



Expenditure

Year to date expenditure is $44.33M, which is $3.76M or 7.8% below budget. 

 


Council Meeting                                                                                                                                                         item: 6.1

24 May 2022

 

 


 

Salary Variances

Across council there is a $1.19M (March YTD: $1.19M) favourable salaries variance predominantly due to the time to complete recruitment of positions identified in the LTP (Long Term Plan) and some vacancies already present at the end of 2020/21. Of this $133K (March YTD: $117K) is related to subsidised work programmes and $441K (March YTD: $361K) relates to unbudgeted KMR staff salaries offset by budgeted grant expenditure.  The total salaries variance is partially offset by $218K (March YTD: $294K) of annual leave earned not taken.

 

Transfers to reserves

For the year to date there has been a net transfer to reserves of $5.4M compared to a budgeted net transfer to reserves of $3.8M.  This is predominantly due to:

Ÿ $1.68M more than budgeted transfers to flood infrastructure river reserves due to higher than budgeted subsidies for capital flood works.

Ÿ $121K more than budgeted transfers to river reserves due to lower than budgeted YTD expenditure relating to maintenance and river clearance works not occurring when budgeted.

Ÿ $989K lower than budgeted transfers to externally managed funds due to lower than budgeted gains.

Ÿ $54K more than budgeted transfers from transport reserves due to lower than budgeted YTD expenditure. Consisting of $84K for Far North transport reserve offset by ($138K) for the Whangarei transport reserve.

Ÿ $728K more than budgeted transfers to the Kaipara Moana Remediation reserve due to the Kaipara Maurikura not yet requiring funding this financial year.

Ÿ $303K lower than budgeted transfers from the enterprise system reserve representing lower costs than budgeted at this point in the project.

 

Capital Expenditure

Capital expenditure of $4.56M is lower than the budget of $4.98M due to the timing of expenditure on flood works and numerous other capital works programmes.

 

Attachments/Ngā tapirihanga

Nil


Council Meeting                                                                                                                                                         item: 6.2

24 May 2022

 

TITLE:

Regional Rates Collection - update to 31 March 2022

From:

Vincent McColl, Financial Accountant

Authorised by Group Manager/s:

Bruce Howse, Pou Taumatua – Group Manager Corporate Services, on 18 May 2022

 

Whakarāpopototanga / Executive summary

The three district councils administer the collection of the regional council rates on our behalf.  The purpose of this report is to provide an update on the collection of this year’s current rates and the rate arrears owing to the regional council by each district council.

 

Table One below summarises the level of rates collected in the first three quarters of the 2021/22 financial year and the total outstanding rate balances at 31 March 2022.

 

Overall, the three district councils collected a total of 74.8% of our annual rate strike in the nine months to 31 March 2022.  (As a comparative, 74.4% was collected for the same period in the last financial year).

 

 

Ngā mahi tūtohutia / Recommendation

That the report ‘Regional Rates Collection - update to 31 March 2022’ by Vincent McColl, Financial Accountant and dated 5 May 2022, be received.

 

 

Background/Tuhinga

Whangārei District Council (WDC)

The Whangārei District Council collected 78.5% of our annual rate strike to the end of March 2022 (Last financial year comparison (LY) 79.7%).  WDC advised that their collection team continues to work with debtors to find appropriate payment solutions however progress is slow on the project to address rates arrears on whenua Māori.

39.0% ($209k) of the WDC outstanding rate arrears balance (LY: 44.7%; $278k) was also collected in the first nine months of this financial year resulting in a closing rate arrears balance of $328k. WDC advises that there was little movement in prior years arrears from January to March. There are almost 40 customers’ arrears been referred to our debt collection agency and there are a number of properties that have reached the next step of rating sale.

 

Kaipara District Council (KDC)

The Kaipara District Council collected 75.4% of our annual rate strike to the end of March 2022 (LY: 75.5%). 

25.9% ($230k) of the KDC outstanding rate arrears balance (LY: 26.1%; $245k) has also been collected in the first nine months of this financial year resulting in a closing total rate arrears balance of $656k.

 

Far North District Council (FNDC)

The Far North District Council has collected 69.5% of our annual rate strike to the end of March 2022, (LY: 66.3%). 

17.1% ($422k) of the FNDC outstanding rate arrears balance has also been collected in the first nine months of this financial year, (LY: 13.8%; $558k), resulting in a closing rate arrears balance (excluding current year rates) still to be collected of $2.0m.  Māori freehold land (MFL) accounts for $1.1m of the total rate arrears balance.

Attachment 1 is the revenue and collections report provided by FNDC outlining the actions they have in place to collect outstanding rate arrears.

 

 

Attachments/Ngā tapirihanga

Attachment 1: FNDC Q3 written report on rates arrears collection   


Council Meeting  ITEM: 6.2

24 May 2022Attachment 1

PDF Creator

PDF Creator


Council Meeting                                                                                                                                                         item: 7.1

24 May 2022

 

TITLE:

Regional Projects Reserve: Criteria and procedures for the allocation of funding

From:

Darryl Jones, Economist and Simon Crabb, Finance Manager

Authorised by Group Manager/s:

Bruce Howse, Pou Taumatua – Group Manager Corporate Services, on 18 May 2022

 

Executive summary/Whakarāpopototanga

In its Long Term Plan 2021-2031 (LTP), council renamed the Infrastructure Investment Fund (IIF) Reserve as the Regional Projects Reserve (RPR) and broadened its purpose.  In the LTP deliberation report considered by council on 19 May 2021, it was recommended that criteria be developed for the RPR before any funding is allocated from it.  The balance of the RPR was $14.7 million at the end of January 2022.  This balance is invested in council’s long-term investment fund, providing a budget contribution of $723,546 to council’s bottom line in 2021/22.

 

This item provides a criteria and procedures for the allocation of funding (the Criteria) from the RPR for adoption by council (Attachment One). Draft Criteria were discussed by the Audit and Risk Subcommittee at their meeting on 24 November 2021 and by council at a workshop session on 16 March 2022. Important aspects of the Criteria include: the requirement for capital repayment; for the proposal to be revenue neutral for council; a limit on the proportion of the RPR that can be allocated to any one project; and that a business case be provided as part of a funding allocation decision. Staff recommend that council adopt the proposed Criteria. 

 

Recommendation(s)

1.         That the report ‘Regional Projects Reserve: Criteria and procedures for the allocation of funding’ by Economist and Finance Manager and dated 7 April 2022, be received.

2.         That council agrees to adopt the Criteria and procedures for the allocation of funding from the Regional Projects Reserve contained in Attachment One of this agenda item to the council meeting on 24 May 2022. 

 

Options

 

No.

Option

Advantages

Disadvantages

1

Adopt the Criteria and procedures for the allocation of funding from the RPR.

Ensures that the RPR is used for its intended purpose.

Provides direction on the information required to make a funding allocation.

Sets a hurdle that Projects must met to be funded from the RPR.

2

Don’t adopt the Criteria and procedures for the allocation of funding from the RPR.

Allows council to consider projects on a case-by-case basis.

Increases the risk that inappropriate projects be funded from the RPR.

 

The staff’s recommended option is Option 1, to adopt the Criteria and procedures for the allocation of funding from the Regional Projects Reserve. The adoption of the Criteria will ensure that the RPR is utilised for the purpose intended and assist decision-makers in making funding decisions. It is modelled on the criteria and procedures used for allocation of funding from the Investment and Growth Reserve (IGR) to provide a degree of consistency in criteria used to allocate reserve funding.

Considerations

1.         Environmental Impact

There are no environmental risks or negative impacts associated with this decision. The Criteria being adopted contains several clauses which require an assessment of the environmental impact of a project being considered for funding from the RPR.

2.         Community views

There are no community views on this issue that need to be considered. Changing the name and purpose of the reserve was part of the LTP Consultation Document. Ninety-one of 171 submitters responded to this question, with 46 agreeing with the proposal, 23 disagreeing, 22 neutral. Eighty did not select an option. Northland Inc in their submission noted the similarities between the purpose of the proposed regional project reserve and the purpose of the existing Enabling Investment funding category of the IGR. The proposed Criteria being adopted seeks to make this distinction clear.

3.         Māori impact statement

Māori have not been specifically engaged over the criteria and Māori views are unknown.  However, clause 8.c.ii. of the proposed Criteria requires the business case for any project to consider environmental, social and governance (ESG) factors which would include consideration of the impacts on Māori.

4.         Financial implications

There are no financial implications associated with this decision. However, a future decision to allocate funding from the RPR under the Criteria has financial implications for council. This is the reason why certain requirements, such as the need for repayment of the principal and council revenue neutrality, have been written into the Criteria.

5.         Implementation issues

The Criteria will require the development of a business case and consultation with Northland Inc and the Joint Regional Economic Development Committee when relevant. However, such actions are considered necessary to make a robust decision to allocate funds from the RPR.

 

6.         Significance and engagement

This matter does not trigger council’s Significance and Engagement Policy, and no public consultation is required for council to make the decisions detailed in this report. 

7.         Policy, risk management and legislative compliance

 This decision is consistent with policy and legislative requirements. Adopting the Criteria reduces the risk that money will be inappropriately allocated from the RPR.

 

 

Attachments/Ngā tapirihanga

Attachment 1: Criteria and procedures for the allocation of funding from the Regional Projects Reserve  


Council Meeting  ITEM: 7.1

24 May 2022Attachment 1

PDF Creator

PDF Creator


Council Meeting                                                                                                                                                         item: 7.2

24 May 2022

 

TITLE:

Fund Manager Withdrawal

From:

Bruce Howse, Pou Taumatua – Group Manager Corporate Services

Authorised by Group Manager/s:

Bruce Howse, Pou Taumatua – Group Manager Corporate Services, on 06 May 2022

 

Executive summary/Whakarāpopototanga

EriksensGlobal, councils investment advisor, recommend withdrawing $1 million from the Harbour T.Rowe Price Global Equity fund and investing this in self-managed cash (Term Deposits) maturing in September 2022.  The self-managed cash would remain in the Long-Term Fund.  The purpose of this withdrawal is to ‘reduce the exposure to global equities at this stage in the economic cycle as a part of the ongoing de-risking strategy’.  Refer to attachments for EriksensGlobal advice.

 

The withdrawal to self-managed cash is in accordance with the SIPO LTF range for self-managed cash of 0-20%, noting that self-managed cash in the LTF was sitting at $1.999M or 3.2% of the LTF as reported in the 28 April 2022 Externally Managed Investment Funds report.

 

 

Recommendation(s)

1.         That the report ‘Fund Manager Withdrawal ’ by Bruce Howse, Pou Taumatua – Group Manager Corporate Services and dated 6 May 2022, be received.

2.         That council approves withdrawing $1 million from the Harbour T.Rowe Price Global Equity fund and investing in self-managed cash (Term Deposits) to be held in the Long Term Fund maturing in September 2022.

 

Options

 

No.

Option

Advantages

Disadvantages

1

Withdraw $1 million from the Harbour T.Rowe Price Global Equity fund and invest in self-managed cash in the LTF.

Reduce the exposure to global equities at this stage in the economic cycle as a part of the ongoing de-risking strategy.

The potential yield from self-managed cash is less than the potential yield from global equities, however the risk with global equities is higher particularly at this stage in the economic cycle.

2

Maintain the current investment holdings of $3.16M in the Harbour T.Rowe Price Global Equity fund

The potential yield from global equities, however the risk with global equities is higher particularly at this stage in the economic cycle.

Greater risk exposure at this stage in the economic cycle.

 

Options 1 is recommended.

Considerations

 

1.         Significance and engagement

In relation to section 79 of the Local Government Act 2002, this decision is considered to be of low significance when assessed against council’s Significance and Engagement Policy because it is part of council’s day to day activities.  This does not mean that this matter is not of significance to tangata whenua and/or individual communities, but that council is able to make decisions relating to this matter without undertaking further consultation or engagement.

Background/Tuhinga

Nil.

 

Attachments/Ngā tapirihanga

Attachment 1: EricksensGlobal Advice   


Council Meeting  ITEM: 7.2

24 May 2022Attachment 1

PDF Creator


Council Meeting                                                                                                                                                         item: 7.3

24 May 2022

 

TITLE:

Regional Software Holdings Limited - Reporting and 2023-2025 Statement of Intent

From:

Carol Cottam, Information Services and Technology Manager

Authorised by Group Manager/s:

Bruce Howse, Pou Taumatua – Group Manager Corporate Services, on 13 May 2022

 

Executive summary/Whakarāpopototanga

Regional Software Holdings Limited (RSHL) is a council controlled organisation.  Council has a 16.75% shareholding in RSHL, and Council’s Chief Executive is one of the six RSHL directors.

RSHL provides a framework for collaboration between its shareholders and across the sector. It supports the procurement or development of shared solutions in a manner that provides greater consistency in how we operate our core processes.  RSHL provides a more cost effective alternative than individual councils can achieve on their own.

This report presents the RSHL:

·    Half Yearly Report on the RSHL’s operations for the first six months of the current year ending 31 December 2021, attached as Attachment 1, for council information.

·    Draft Statement of Intent (SOI) for 2022-2024 and associated Management Report as Attachment 2 and 3. The RSHL SOI is presented for council review and sets out RSHL’s planned activities, objectives and performance targets for the next three years.

 

Recommendation(s)

1.         That the ‘Regional Software Holding Limited – Reporting and 2023-2025 Statement of Intent’ by Carol Cottam, Information Services and Technology Manager and dated 13 May 2022, be received.

2.         That council receive the Regional Software Holdings Limited’s Statement of Intent 2023-2025.

 

Options

 

No.

Option

Advantages

Disadvantages

1

Receive the Statement of Intent for RSHL

Compliant with legislative requirements.

The RSHL SOI is received by council.  Council’s investment is managed appropriately.

No material disadvantage.

2

Do not receive the Statement of Intent for RSHL

No advantage through not receiving the SOI.

Not compliant with legislative requirements.

Potentially destroys council’s value in our CCO and council’s shareholding may not be managed appropriately.

 

The staff’s recommended option is 1.

Considerations

1.         Significance and engagement

In relation to section 79 of the Local Government Act 2002, this decision is considered to be of low significance when assessed against the council’s Significant and Engagement Policy because it is part of council’s day to day business.

2.         Policy, risk management and legislative compliance

This decision is consistent with council’s policy as a shareholder if RSHL.

Being a purely administrative matter, community views, Māori impact statement, financial implications and implementation issues are not applicable.  The regional sector collaborative programmes, including the IRIS Next Gen Programme, are budgeted within Council’s Long Term Plan.

 

Background/Tuhinga

RSHL is a council controlled organisation owned by Waikato Regional Council (32.75%), Northland Regional Council (16.75%), Horizons Regional Council (15.50%), Taranaki Regional Council (15.50%), Southland Regional Council (15.50%), and West Coast Regional Council (4.00%).

 

Half Yearly Report to shareholders for the 6 months ending 31 December 2021 (Attachment 1)

RSHL is on track to achieve its 2020/21 non-financial performance measures. 

 

It is expected that the income and expenditure for RSHL activities will be close to budget.

 

The Regional Sector Shared Services revenue (within the Regional Council Collaboration (ReCoCo) Activity) far exceeds its budget because of the unbudgeted revenue from the Sector Financial Management System.  This revenue is treated as revenue in advance that RSHL holds on behalf of the regional sector.  The corresponding Regional Sector Shared Services expenditure is also significantly more than budget due to the increased activity from the Sector Financial Management System.

 

Attachment 1 Item 7 Six Month Report to Shareholders 31 December 2021.

 

Draft Statement of Intent (SOI) for 2023/2024/2025 (Attachment 2 and 3)

RSHL submitted their draft SOI to council for review.

 

The important changes to this SOI set out the changes to implement the regional sector shared services organisation. The key features are:

·    The company will be restructured to form a regional sector shared services organisation; and

·    The IRIS Next Gen Programme will be confirmed; and

·    Existing sector functions run individually by councils will become part of RSHL.

 

Attachment 2 Item 6b Management Report 2022 to 2025 Draft Statement of Intent.

Attachment 3 Item 6a Draft Statement of Intent 2023 to 2025

 

Attachments/Ngā tapirihanga

Attachment 1: Regional Software Holding Limited - 7 Six Month Report to Shareholders 31 December 2021

Attachment 2: Regional Software Holding Limited - Item 6b Management Report  2022 to 2025 Draft Statement of Intent

Attachment 3: Regional Software Holdings Limited - Item 6a  Draft Statement of Intent 2023 to 2025   


Council Meeting  ITEM: 7.3

24 May 2022Attachment 1

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator


Council Meeting  ITEM: 7.3

24 May 2022Attachment 2

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator


Council Meeting  ITEM: 7.3

24 May 2022Attachment 3

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator


Council Meeting                                                                                                                                                         item: 7.4

24 May 2022

 

TITLE:

Poplar and Willow Nursery Expansion

From:

Ruben Wylie, Land Management Programme Manager

Authorised by Group Manager/s:

Jonathan Gibbard, Pou Tiaki Taiao – Group Manager Environmental Services, on 18 May 2022

 

Executive summary/Whakarāpopototanga

Council established a poplar and willow nursery in 2013 to supply poplar and willow poles to landowners with erosion prone land. This initiative is a key component of council’s long-term soil conservation programme. As part of the 2021-2031 Long Term Plan, council budgeted $1,270,000 to invest in the expansion of the nursery, split at $790,000 over 2021/22 and $480,000 spread over the two following years. Following a detailed analysis of investment options, staff recommend investing a portion of the available budget into the existing site, and retaining the remainder of the budget to expand the nursery once land becomes available nearby.

 

Recommendation(s)

1.         That the report ‘Poplar and Willow Nursery Expansion ’ by Ruben Wylie, Land Management Programme Manager and dated 4 May 2022, be received.

2.         That the capital budgets for the nursery expansion are retimed by:

a.         allocating $200,000 in the 2022-2023 financial year to develop the existing poplar and willow nursery;

b.        allocating the remainder of the capital budget to the 2023-2024 financial year to enable expansion of the existing nursery through the purchase of nearby land and associated site development.

3.         That council acknowledges the poplar pole production targets:

a)    contained within the 2021-2031 Long Term Plan will not be achieved;

b)    for the current site will be 7000 poles per annum (following further site optimisation investment); and

c)    need to be reassessed following the purchase of additional land to support nursery expansion.

4.         That staff report back to council by March 2023 to provide an update on capital progress with nursery upgrades and further enquiries into potential land acquisition.

 

Options

 

No.

Option

Advantages

Disadvantages

1

Invest in existing site and retain funds to purchase nearby land.

Provides for a financially prudent approach for expansion that manages investment risk whilst optimising production at the existing nursery.

Dependant on land becoming available for expansion and recuses the amount of poplars able to be produced until additional land is able to be acquired.

2

Invest in a new site

A new site provides certainty that council will meet its poplar pole delivery targets.

Council does not have budget for this option and the availability of land is a substantial unknown.

3

Upgrade the existing site with no expansion.

This option is the least costly.

This option will limit poplar production to approximately 7000 poles per annum.

 

The staff’s recommended option is Option1

Considerations

1.         Environmental Impact

The recommended decision will limit the amount of poplar and willow material available for soil conservation treatment until such time as new land is developed to expand the nursery. Although this outcome may limit the area of land under active soil conservation management in the short-term, it is considered that the long term environmental impact will not be significant given the multi-generational nature of soil conservation treatments.

2.         Community views

Community views are not known. However, staff consider that the recommended option represents the best balance between financial prudence and environmental outcomes and it is expected that the community would generally be supportive of the recommendation.

3.         Māori impact statement

It is recognised that Māori are likely to prefer the provision of native plant species above those of exotic species. At this stage however there are no known native species that have the same soil conservation properties while also enabling landowners to maintain their farming operations.  It should be noted that the decision to expand the poplar and willow nursery was consulted on and a decision to expand the nursery was made as part of the 2021-2031 Long Term Plan process.

4.         Financial implications

The recommendation will result in the deferring of capital expenditure that is already set down in the Long Term Plan 2021-2031. The key financial implication is therefore deferring of expenditure. Capital expenditure is funded from councils retained earnings.  The majority of the capital expenditure will be applied to land purchase and therefore will not impact rates.  The smaller proportion of expenditure will be on asset development and will have an impact on rates as these assets are capitalised (this was taken into account during LTP deliberations). The deferring of investment is therefore not going to result in any material rating impacts other than a small delay in when the rating impact occurs as it relates to asset depreciation.

5.         Implementation issues

The key implementation issue relates to availability of land for expansion. It is assumed land will become available as a result of the land acquisition by KiwiRail associated with the Marsden Point spur line. Council has first right of refusal for any land disposal associated with the acquisition process. Delays in the aquation process by Kiwirail will limit council’s options for future land purchase.

 

Deferring the expansion of the nursery, and subsequent increase in production of poplar poles, will have an impact on Council’s ability to achieve its Long Term Plan KPI’s associated with poplar pool production.  It is estimated that our current site, once optimised, will be able to produce 7000 poles.

 

6.         Significance and engagement

In relation to section 79 of the Local Government Act 2002, this decision is of low significance when assessed against council’s significance and engagement policy because it is part of council’s day to day activities. This does not mean that this matter is not of significance to tangata whenua and/or individual communities, but that council is able to make decisions relating to this matter without undertaking further consultation or engagement. Policy, risk management and legislative compliance

 There are no known policy or legislative compliance issues associated with this decision.  The main risks of this decision are outlined in the Implementation Issues and Financial Implications sections of this report.

Background/Tuhinga

NRC established the poplar and willow nursery in 2013 to supply poplar and willow poles to land owners with erosion prone land. The Nursery is spread across 16 hectares of land at 185 Flyger Road in Mata. Average annual production from the nursery since 2018 is approximately 6000 poles per year

 

The nursery is a key asset of council’s long-term soil conservation programme. In recognition of the role poplar and willows contribute towards council’s soil conservation programme, the 2021-2022 Long Term Plan budgeted to invest $1.270,000 towards the expansion of the nursery. The phasing of that budget is $790,000 in 2021/22, with the remainder spread over the two following years. The purpose of the expansion was to increase production to 25,000 poles per year by 2031. That target is a key performance indicator within the 2021-2022 long term plan.

 

Implications of the Kiwirail Marden Spur

Kiwirail is planning to develop a new rail corridor to connect Marsden Point to the main rail line at Oakleigh, south of Whangarei. Kiwirail is currently in the land acquisition phase of the development. Approximately 4ha of the nursey site is designated for the rail corridor. The rail development will therefore result in a reduction in productive capacity of the current nursey area.

 

The rail development will also increase council’s options for land purchase for nursery expansion. As Kiwirail acquires land, it will dispose of land in excess of the requirements for the corridor. Council has an agreement with Kiwirail, that, amongst other things, gives first right of refusal for any land disposal associated with the rail development process.

 

Investment options

Staff commissioned a business case to identify investment options, and analyse these in the context of strategic, financial and economic drivers. Expansion options were developed and costed with a view to achieving the 2021-2022 long term plan production KPI of 25,000 poles per year.

 

 

 

 

Four options were considered and these are summarised below.

 

Scenario 1: Expand the current site

Under this scenario, the current footprint of the nursery would be expanded through purchasing approximately 15ha of land from neighbouring land parcels, bring the total area of the nursery to 22ha.

 

A critical constraint for this option is the availability of land surrounding the current nursey. Currently there appears to be no land available to purchase. Enquiries to date have confirmed that neighbouring landowners are currently not interested in selling. 

 

Land suitable for expansion of the nursery is expected to become available as part of the acquisition and associated disposal process for the Marsden Spur. However, the acquisition process may be several years away from completion.

 

This scenario has an estimated capital cost of $1,500,000.

 

Scenario 2: upgrade and improve the existing site

This scenario envisages no expansion to the existing footprint but operational improvements to optimise the productive capacity of the existing nursery. The nursery is currently not fully optimised in terms of productive capacity due to a lack of infrastructure investment. By investing in improved irrigation, additional water sources and improved drainage, it is expected production could be increased to approximately 7000 poles per year, taking into account the land removed for the rail corridor.

 

This scenario has a total capital cost of $320,000, but will limit pole production to approximately 7000 poles per year, falling well short of the Long Term Plan target of 25,000 per year.

 

Scenario 3: Purchase a new site and sell the current site

Under this scenario, NRC would eventually withdraw from the current site and establish a new nursery at a new site with the appropriate size and conditions.

 

This scenario is the recommended option set down in the business case. The business case recommended this scenario because it is likely to provide the greatest certainty that council will be able to deliver on its pole production targets within the timeframes set down in the LTP. However, the capital expenditure associated with this option is $2,040,000, and so is substantially in excess of the LTP budget.

 

Scenario 4: Retain the existing site and purchase a new site

This scenario is premised on NRC retaining the current nursery site and purchasing a new land parcel to establish a second nursery, replicating production processes across both sites.

 

This option would result in operational inefficiencies resulting from the need for staff to move between nurseries and either share equipment or duplicate assets to manage both sites. For these reasons, this option was identified as having the highest operational cost. Capital costs associated with this option were estimated to be $1,500,000M.

 

Discussion

Council does not have sufficient budget for any of the options required to meet the 25,000 pole target. Moreover, due to staff resourcing constraints, even with sufficient budget, delivering $790,000 of capex this year to invest in the nursey would have been a major practical challenge. Although the business case recommend scenario 3 (develop a new site and sell the old site) as the best option, that recommendation was on the basis of solely meeting the 25,000 pole target within the timeframes specified within the LTP.

 

The LTP pole KPI assumed substantial demand from the Kaipara Moana Remediation (KMR) programme. That demand has not eventuated to date because at present KMR is focused on delivering riparian fencing and native riparian planting, and it is yet to decide on whether the programme will fund exotic trees as an erosion treatment. With the above taken into account, poplar pole demand is likely to lag behind the targets set down in the LTP.  However, the pole target remains relevant. It is expected that implementation of Freshwater Farm Plan regulations, and as landowners become more accustomed to the multiple benefits associated with establishing poplars on highly erodible land, that demand will continue to increase. For this reason, it is considered appropriate to invest in the nursery to meet demand in a manner that is generally aligned with the the 2021-2031 LTP, but that the investment should be deferred to ensure the investment is financially prudent, takes into account staff and land availability constraints and matches the demand generated by future legislative and strategic initiatives.

 

With the above factors taken into account, it is recommended council defer the capital expenditure for the nursery expansion to enable the existing nursery to be upgraded over the 2022-2023 financial year, and reprofile the remaining budgets to allow for land purchase and development at an adjoining (or nearby) site over years 3 and 4 of the LTP. This timing will enable staff to significantly improve the productive capacity of the existing site, and will enable sufficient time to investigate land acquisition options, including those presented by the Kiwirail Marsden Spur development. Retiming the investment will also allow time for the statuary changes that are likely to affect pole demand to come into effect, in addition to council having greater certainty as to the role poplars and willows will play in respect of delivering the KMR programme.

 

Investment required at the existing nursery includes:

·    Additional groundwater source;

·    Additional irrigation and associated electrical work;

·    Earthworks and drainage works to improve site conditions;

·    Plant and equipment to improve operational efficiency.

·    Improved site storage.

 

The total cost of these improvements is estimated to be $200,000, and staff recommend that this quantum of the budget is deferred to the 2022/2023 financial year to enable the productive capacity of the nursery to be improved through capital investment in assets and infrastructure. It is proposed that the remaining budget ($1,070,000) is deferred to 2023/2024 to provide budget for land purchase and site development in year 3 of the LTP.

 

Finally, it is recommended that the poplar pole production target is capped at 7,000 poles per annum with a review of appropriate production targets as part of the 2024-2034 Long Term Plan process. This review will enable staff to determine appropriate poplar pole targets and the associated land requirements for budgeting purposes for the 2024-2034 Long Term Plan process.

 

Attachments/Ngā tapirihanga

Nil


Council Meeting                                                                                                                                                         item: 8.1

24 May 2022

 

TITLE:

Chair's Report to Council

From:

Penny Smart, Chair

Authorised by Group Manager/s:

Penny Smart, Chair, on

 

Purpose of Report

This report is to receive information from the Chair on meetings/events attended, and correspondence sent for the month of April 2022

 

Ngā mahi tūtohutia / Recommendation

That the report ‘Chair's Report to Council’ by Penny Smart, Chair and dated 11 May 2022, be received.

 

Meetings/events attended

During this period, I attended the following meetings/events/functions:

·    Future for Local Government Panel

·    Chair North Chamber

·    Enviroschools Silver Certificate celebration, Tangiteroria School

·    Air NZ Board

·    Reforms update - Mayors, Chairs and Chief Executives

·    TTNEAP Advisory Group

·    Dargaville Grey power

·    Face masks in the environment

·    Regional Sector

Correspondence

During April I sent out the following correspondence:

Date

Addressed To

Subject

05.04.22

Te Matakirea o Ngunguru Working Group

Response letter to Te Waiariki re Ngunguru Sandspit

07.04.22

Chairman, Te Runanga o Te Rarawa

Wairoa stream water quality concerns by Te Rarawa

29.04.22

GM Environmental Services, Northland Regional Council

Position Offer: Chief Executive Officer

 

Attachments/Ngā tapirihanga

Nil


Council Meeting                                                                                                                                                         item: 8.2

24 May 2022

 

TITLE:

Chief Executive’s Report to Council

From:

Malcolm Nicolson, Tumuaki - Chief Executive Officer

Authorised by Group Manager/s:

Malcolm Nicolson, Tumuaki - Chief Executive Officer, on

 

Ngā mahi tūtohutia / Recommendation

That the report ‘Chief Executive’s Report to Council’ by Malcolm Nicolson, Tumuaki - Chief Executive Officer and dated 2 May 2022, be received.

 

8.2.1   Highlights

Tutukaka Annual Structure Surveys

Surveys of all structures and the seafloor were completed in Tutukaka by contractor divers.  This survey has been completed annually since 2015 where fifteen Mediterranean fanworm (Sabella spallanzanii) were discovered on vessels and the seafloor after a heavily infested vessel was found in the harbour.  Although our hull surveillance does detect fanworm occasionally on newly arrived vessels, there has been no new recruitment on structures since 2017 and this species is now considered to be eliminated in the harbour.  This successful eradication highlights the importance of early detection and a rapid response, while also illustrating the success of council’s vector control programme.

Marine Vessel Portal

Marine biosecurity staff continue to collaborate with regional Top of the North partners and central government (Auckland Council, Waikato Regional Council, Bay of Plenty Regional Council, Ministry for Primary Industries, and the Department of Conservation) to develop and populate a marine vessel portal.  The portal will facilitate data collection by users, stakeholders and partner councils, including marinas, haul out facilities, and eventually individual vessel owners empowering them to manage their biofouling and hull cleaning records more easily.

The Marine Vessel Portal is a centralised vessel database that will be crucial to the implementation of the Clean Hull Plan by mapping and recording vessels moving between regional boundaries and allowing members of the public and marinas to access certain information about their vessel or vessels entering their facilities.  There are an estimated 20,000 vessels on moorings and marina berths in the Top of the North area (equating to approximately 90% of all New Zealand’s vessels).  Since the start of this financial year, the Top of the North collaboration has captured vessel information for over 9,000 of these vessels.  In the absence of vessel registration this represents a very valuable tool for the marine biosecurity team as well as other departments in Council.

A screenshot of the Marine Vessel Portal.

2022 Whakamānawa ā Taiao Environmental Awards

Entries to the fourth annual Whakamānawa ā Taiao Environmental Awards closed on 20 April and judging of applications is now underway. A total of 52 entries were received across the 9 categories, including to the new Youth environmental leader category introduced this year. This new category has been included to celebrate and recognise the many young people who are making a positive difference to the environment now and for the benefit of future generations.

 Also new in 2022 is the Kiwi Coast Outstanding group or project award, recognising high achieving Northland groups and projects who have proven their commitment to restoring the health of their local native forests and wildlife, including kiwi. This special award has been introduced to broaden the reach of the awards and to support NRC partners to celebrate and recognise mahi specific to their core focus. There are 10 applications being considered for this award.

The winners of the fourth annual Whakamānawa ā Taiao - Environmental Awards be revealed at an awards celebration in Dargaville on Thursday 26 May.

This year 22 finalists have been announced. The full list of finalists can be found on the awards.nrc.govt.nz website.

 

8.2.2   CEO’s Office

Current Legal Proceedings

Department

Description

Status

Consent decision appeal

Two separate consent applications for replacement and new consents relating to a proposed expansion of, Doug’s Opua Boat Yard in Walls Bay, Ōpua

No further update.  Awaiting direction from the Environment Court.

Consent decision appeal

Irrigation of avocado orchards and horticulture crops

Court Hearing to commence Monday 9 May 2022.

 

8.2.3   CORPORATE SERVICES

Enterprise System Update

Fraud Declaration

I am not aware of any fraud nor am I investigating any incidence or suspected incidence of fraud at this time.

8.2.4   regulatory services

Consents in Process

During April 2022, a total of 203 Decisions were issued.  These decisions comprised:

Ÿ Moorings

1

 

 

Ÿ Coastal Permits

26

 

 

Ÿ Air Discharge Permits

2

 

 

Ÿ Land Discharge Permits

4

 

 

Ÿ Land Use Consents

140

 

 

Ÿ Water Permits

25

 

 

Ÿ Bore Consents

5

 

 

The processing timeframes for the April 2022 consents ranged from:

Ÿ 188 to 1 calendar days, with the median time being 43 days;

Ÿ 79 to 1 working days, with the median time being 27 days.

Thirty-eight applications were received in April 2022.

Of the 176 applications in progress at the end of April 2022:

Ÿ 29 were received more than 12 months ago;

Reasons for being more than 12 months old:

-    Awaiting additional information (including CIAs)

12

-    Consultation with affected parties/stakeholders

4

-    On-hold pending new rules becoming operative

6

-    Other

7

Ÿ 16 were received between 6 and 12 months ago (most awaiting further information from the applicant);

Ÿ 131 less than 6 months.

Appointment of Hearing Commissioners

No commissioners were appointed in April 2022.

Consents Decisions and Progress on Notified Applications in Process, Objections and Appeals

The current level of notified application processing activities at the end of April 2022 is (by number):

Ÿ Applications Publicly/Limited Notified During Previous Month

0

Ÿ Progress on Applications Previously Notified

4

Ÿ Hearings and Decisions

0

Ÿ Appeals/Objections

2

 

COMPLIANCE MONITORING

The results of compliance monitoring for the period 1 – 30 April 2022 (and year-to-date figures) are summarised in the following table and discussed below.

Classification

Total

Full compliance

Low risk non-compliance

Moderate non-compliance

Significant non-compliance

Not exercised during period

Air Discharge

14

11

0

0

0

3

Bore Consent

15

15

0

0

0

0

Coastal Air Discharge

4

4

0

0

0

0

Coastal Discharge

12

9

1

1

0

1

Coastal Permit

196

134

30

25

6

1

FDE – Discharge permit

4

0

0

2

0

2

FDE – Permitted activity

1

0

0

1

0

0

Land Discharge

94

59

7

0

1

27

Land Use Consent

136

51

4

0

0

81

Water Discharge

69

35

9

2

2

21

Water Permit

76

32

3

0

0

41

Water Take

144

83

16

16

0

29

Total

765

433

70

47

9

206

Percentage

 

56.6%

9.2%

6.1%

1.2%

26.9%

Year to date

5500

3921

662

367

67

483

Percentage

 

71.3%

12.0%

6.7%

1.2%

8.8%

Coastal

All Hokianga and Whangaroa Harbour-based coastal permit field inspections have been completed.

Compliance monitoring inspections have been completed for all marine farms, with compliance letters being prepared for consent holders.  Follow up of non-compliance and enforcement action has commenced.

Several incidents and requests were received regarding asbestos containing materials in the coastal marine area, use of unconsented grids and discharges from vessel dry sanding and hull cleaning.

Water, Waste, Air and Land Use (WWALU) Compliance Monitoring

Ÿ Contaminated Land Management

Six incidents involving the discharge of hazardous substances and 13 enquiries regarding contaminated land were received and responded to.  380kg of hazardous waste was disposed of at the amnesty day, and two sites were added to the Selected Land-Use Register.

Ÿ Municipal Wastewater Treatment Plants

WWTP/Consent Status  

Issues (May 2022)  

Enforcement Action/Response   

Far North District  

Ahipara  

Expires 2033  

Ongoing non-compliance with bacteriological consent limits  

Under AN   

FNDC investigating land disposal options; UV system to be installed in 2022/2023 to reduce bacteriological concentrations  

Hihi  

Expires 2022  

No recent issues; replacement consent application yet to be received  

None currently  

Kāeo  

Expires 2022  

No recent issues; replacement consent application yet to be received  

None currently  

Kaikohe  

Expires 30 November 2021  

Intermittent non-compliances with ADW flow, ammonia & bacteriological consent limits.  

System overdue for de-sludging  

None currently  

Issues will be addressed in replacement consent  

Kaitaia  

Expires 30 November 2021  

No recent issues; FNDC discussing with iwi/hapū potential consent conditions  

Under AN (reticulation overflows)  

Issues will be addressed in replacement consent  

Kawakawa  

Expires 2036  

No recent issues  

None currently  

Kerikeri  

Expires 2036  

No obvious issues from new plant (commissioned in December 2020)  

  

Under AN   

Kohukohu  

Expired 2016 (replacement consent application on hold)  

Occasional issues with bacteriological conditions of consent; CIA still awaited before public notification occurs 

None currently  

Opononi & Ōmāpere  

Expired 2019  

Non-compliances with bacteriological consent limits; desludging overdue; still intended to jointly process with Kohukohu replacement consent application  

Under AN  

Issues will be addressed in replacement consent; desludging to be undertaken  

Paihia  

Expires 2034  

Plant upgraded 2019; alkalinity issues preventing optimal ammonia treatment  

None currently   

Alkalinity improvement project still in progress  

Rangiputa  

Expires 2032  

No recent issues  

None currently  

Rāwene  

Expires 2023  

System overdue for de-sludging  

Infringement notices issued in February 2022 in relation to a discharge from the reticulation  

Russell  

Expires 2024  

Occasional non-compliances with E. coli consent limit post UV  

Under AN  

Infringement notices issued January 2022  

Taipā  

Expires 2029  

No recent issues  

None currently  

Whatuwhiwhi  

Expires 2025  

Elevated TSS levels (consent limit may be unnecessarily restrictive)  

FNDC to seek consent variation to address TSS levels – however this is not a priority  

Whangarei District  

Hikurangi  

Expires 2025  

Intermittent issues with plant performance  

None currently  

Plant performance being reviewed to identify improvements  

Ngunguru  

Expires 2035  

No recent issues  

None currently  

Ōākura  

Expires 2025  

Occasional spikes in E. coli  

None currently  

Portland  

Expires 2024  

No recent issues  

None currently  

Ruakākā  

Expires 2046  

No recent issues  

None currently  

Tutukaka  

Expires 2024  

No recent issues  

None currently  

Waiōtira  

Expires 2030  

No recent issues  

None currently  

Waipū   

Expires 2030  

No recent issues  

None currently  

Whāngārei City  

Expires 2022  

Odour issues; replacement consent application received and will be publicly notified shortly  

Abatement notice issued requiring actions to be implemented to mitigate the odour emanating from the treatment plant 

Kaipara District  

Dargaville  

Expires 2022  

Non-compliances with WQ discharge volume consent limits, replacement consent application received

Under AN  

Glinks Gully  

Expires 2024  

No recent issues  

None currently  

Kaiwaka  

Expires 2022  

No recent issues; replacement consent application yet to be received   

None currently  

Mangawhai  

Expires 2042  

Odour complaints and occasional exceedances of TDS consent limit  

Under AN  

 

Maungaturoto  

Expires 2032  

Intermittent non-compliances, generally due to high rainfall  

Under AN  

Te Kopuru  

Expires 2044  

Intermittent minor non-compliances  

Second aerator installed 2020 

Environmental Incidents

There were no environmental incidents reported in April which resulted in a significant environmental impact.

ENFORCEMENT

Abatement Notices, Infringement Notices and Formal Warnings

The following is a summary of the abatement and infringement notices issued:

Action Type

Number

Abatement Notice

4

Infringement Notice

1

 

 

Other Enforcement

·   Open burning on industrial/trade property – Whangārei 

Charges were laid in the Whangārei District Court on 27 November 2020 against an individual for open burning on industrial/trade premises; the burnt items also included prohibited items. There are two charges against the individual who pleaded not guilty on 30 April 2021. The Court has allocated new hearing dates to 25 – 27 May 2022. Witnesses have confirmed their availability. 

·    Farm dairy effluent – Parapara 

Charges were laid in the Kaitaia District Court on 6 May 2021 against a farm owner for offences which occurred in August 2020. There are four charges against the farm owner. Following reports that were received confirming that the farm owner was not able to enter plea and provide instructions, the judge has made the following two decisions: 

1.  The farm owner is unfit to stand trial. 

2.  Based on the NRC’s summary of facts, the farm owner caused acts that formed the basis of all four offences. Those offences are very serious. The psychologist will provide a final report by 16 May 2022.  

The Court adjourned the case to 2 June 2022 with the farm owner to attend.   

·    Vessel occupying CMA & removal of asbestos from CMA – Town Basin, Whangārei

An enforcement order was applied for on 23 November 2021 against an individual for occupying the coastal marine with a boat without consent, and for reimbursement of costs associated with work to remove and dispose of cladding material containing asbestos that had been deposited within the coastal marine area. Following a joint memorandum filed in February 2022, the individual has arranged a place to legally moor the boat. Environment Court also issued enforcement orders against the individual requiring compliance with permitted activity rule C.1.2.1. of Proposed Regional Plan for Northland.
A proposal has been made to the individual for settlement of judicial review proceedings and costs.

·    Earthworks & vegetation clearance within a wetland – Teal Bay 

Charges were laid in the Whangarei District Court on 7 December 2021 against four parties for offences that occurred in December 2020. During a court appearance via Teams in March 2022, the defendants’ lawyers have requested more time to consider disclosure, provide advice, get instructions and discuss with NRC. Court has adjourned the case to 2 June 2022 with pleas having to be entered on that day. 

 

8.2.5   ENVIRONMENTAL SERVICES

land management

Sustainable Hill Country and Regional Priorities

Milestones

Status

Farm Environment Plans (FEPs)

To date, 53 (39%) of 136 soil conservation plans have been completed in 2021-2022. Eight are in progress. We will not meet our soil conservation plan KPI’s for the SHaRP programme and are engaging with MPI around the reasons for this and seeking agreement on a way forward. 

 

 

 

 

 

Poplar and Willow nursery

Objective

Status

Harvest

Currently processing orders with harvest starting later this month. For the first time the nursery is supplying 1 year old material as 1m wands in addition to traditional 3m poles that take three years to produce. This is in response to variable survival rates of poles in recent years and a likely loss of productive land at the nursery due to the rail corridor. We expect wands to be more resilient to drought compared to poles and we can produce significantly more 1 year wand material compared to poles that should help compensate for the loss of nursery area. Furthermore, wands will be cheaper to produce so can be planted at higher stocking rates to control erosion sooner.

 

Environment fund progress

The Environment fund grants for 2021/22 are nearing completion.  Across the region (excluding the Kaipara catchment) there are 50 projects, totaling just under $500,000, that are still to be finished and reviewed before the end of the financial year. Land Management Advisors are busy in the field doing sign-off visits.

Whangārei urban awa project

The project is continuing at a slower pace than the first year.  Year 2 Q3 reporting has been submitted to MfE on schedule. Key points:

·   2.9 kms of fencing completed across 5 properties (total of 5.5kms completed so far this year towards the target of 5.8kms).

·   Most fencing projects now very small, so not particularly efficient.

·   Million Meters funding project was closed at $13,302. This funding will go towards planting projects.

·   Landowner engagement/interest has diminished relative to Y1.  We are well on track to meet our fencing requirements for the year.  However, demand for planting is still light.

·   On track against the Y2 fencing budget but a carryover of planting budget to Year 3 is expected. In line with the reduced interest in the project shown over the past months, we are also working with MFE to extend the scope of the project slightly.

·   We expect a deed variation to be approved soon to extend the timeframe for the project from June 2023 to January 2024.  This will provide a full planting season next winter, as well as time for release spraying for the new plants.

·   We’ve also requested that the project be extended to include the Otaika catchment. This will allow us to more efficiently reach our fencing and planting KPIs, by working with larger land holdings in the new catchment.

 

biodiversity

FIF Dune Lakes Project

Objective

Status

Aquatic weed and pest fish control

A report on the vegetation damage at Lake Tutaki was sent to Iwi partners, EPA, MFE and NRC compliance.  Vegetation plots were established at Lake Tutaki to monitor the effect of aquathol on the wetland vegetation.  Further application of aquathol to control hornwort has been postponed till spring 2022 and summer 2023 as lakes have poor water visibility, meaning post-application LakeSPI monitoring has not been possible.  The EPA will be undertaking an investigation, including against consents issues by NRC, into the unintended vegetation damage and whether formal compliance action is warranted.

Sediment and nutrient mitigation

A planning assessment confirmed resource consent is required for the constructed wetlands at Black Lake, Kai Iwi Lakes.  A contract for this work and engineering plans and project management is out for tender and closes first week of May.

Partnerships

Ngā Roto Tapokapoka Tūhono Wānanga is being hosted by Te Roroa and the FIF programme and will take place on 16-18 May at Kai Iwi Lakes.

 

CoastCare

A hui was held with NRC Biodiversity and Natural Resources staff and Patuhareke Te Taiao Environment Unit to debrief on the pilot Bream Bay dune monitoring programme run over the summer and to discuss longer term goals and visions.  In this pilot, which also involved collaboration with Northtec, various methods were used to monitor dune health, with a focus on the animals (fauna) that live in the dunes.  This was aligned with vegetation monitoring to get a fuller understanding of dune health, and the relationships between flora and fauna in the dunes.  Patuharakeke are keen to continue the monitoring and intend to use the information about the dune fauna to support their advocacy work around vehicle use and human behaviour in our precious dune systems.  As well as continuing monitoring at Bream Bay, we plan to use learnings from this study to incorporate fauna surveys into our dune monitoring programme at other Northland sites to get a fuller understanding of dune health and how our restoration work can enhance the ecology of these environments.

A picture containing ground, outdoor, outdoor object, insect

Description automatically generated

An endangered native katipō spider with egg sacs found in a shelter on Ruakākā dunes

 

 

 

 

 

 

 

 

 

Wetlands

The Envirolink project for the design of a Northland wetland SOE monitoring programme has been progressed with a workshop with NRC, Manaaki Whenua Landcare Research (MWLR), NIWA and DOC specialists held late April to compile a draft list of wetlands to monitor.  Further mapping and analysis are to be carried out and a final report from MWLR is due at the end of June.

The wetland condition index monitoring programme has continued this month with a further three site visits carried out and remaining sites, out of more than 30 wetlands monitored, planned for May.

 

Natural resources

 

Coastal/Water Quality Operations

·   A new quarterly Litter Intelligence monitoring site at Pah Road in Onerahi, (a Significant Ecological Area) was surveyed in early February 2022.  Plastic accounted for the most common item found.  An article summarising our collaboration with various organisations is in the NZ Coastal Society March 2022 Newsletter. https://www.coastalsociety.org.nz/assets/Uploads/files/CN-77-2022-3.pdf

·   Shellfish surveys have concluded for 2022.  Surveys were conducted at Houhora Heads, Taipā, Kelly’s Bay and Hokianga (Koutu and Pakanae) with the help of whanau, hapū and local schools.

·   Work has progressed for the implementation of water quality modelling for our popular recreational bathing swimming locations, through Auckland Council’s Safeswim platform, safeswim.org.nz.  Following the successful trial of seven sites over the past summer, key contracts have been signed for delivery of all sites next summer.  Discussions are continuing on a service level agreement with Auckland Council for ongoing ‘access’ to Safeswim.

 

Natural Resources Science

 Air quality and carbon emission

·    Natural Resource Science air quality is in the process of implementing the outcome of the environmental monitoring network review and searching for new air monitoring sites in the Kaitaia and Whangārei airsheds.

 

Coastal

·    The final audit of the stormwater litter project has been completed.  In total 20,450 items were captured by the 51 littatraps over the twelve-month study period.  The worst sites were a transport and logistics site in Whangārei, which captured a total of 2,416 items, and a city center car park which captured 2,172 items.  In contrast, a residential street in Dargaville captured just 24 items over the twelve-month period.  The next stage of the project is to analyse and understand the large differences in the quantity of litter and plastic captured at different sites and to estimate the total quantity of plastic entering our coastal marine area each year.

 

Hydrology

 Rainfall

 

Diagram

Description automatically generated

·    April rainfall was above average in Eastern and Central areas of Northland, and below average in the West.

·    The Eastern Hills (North-East of Whangārei) received the most rain with the Hatea at Glenbervie Forest HQ recording 285mm for the month, which is 252% of expected.

·    Western areas were much drier with the Hokianga at Opononi recording 38.5mm for 62% of expected, and Pouto Point recording 33.5mm for 61% of expected.

 

 

Rivers

Map

Description automatically generated

River flows for the month followed the general pattern of rainfall with primarily normal to above normal flows in Northland’s Eastern and Central catchments, ranging down to low, to very low, flows in some Western catchments.

 

Groundwater

Map

Description automatically generated

Groundwater levels continue to re-charge and all aquifers are in the normal to above normal range for April 2022.

 

Climate Outlook

Regional predictions for Northland in NIWA’s climate outlook for May to July 2022 can be summarised as follows:

·   Temperatures are very likely to be above average (70% chance).

·   Rainfall totals are equally likely to be near normal (40% chance) or above normal (35% chance).

·   Soil moisture levels and river flows are about equally likely to be near normal (40% chance) or below normal (40% chance).

 

POLICY AND PLANNING

Freshwater Plan Change

The Primary Sector Liaison Group were given an update on the role of the Land Management Team and NRC’s Freshwater Plan Change communication plan.  Currently setting up confidentiality agreements so that the water quality scenario modelling and costing can be released to the group.

The Tangata Whenua Water Advisory Group completed its Stage 1 Report and will present this to TTMAC in May for endorsement before presenting it to council.  Work is now progressing on their Stage 2 work which includes their recommendations for the plan change and advice to council on how council can best engage with mana whenua.  This advice is anticipated in July.

Proposed Regional Plan Appeals

·   Topic 1 (coastal activities) council staff circulated a suite of 22 rules, six policies, one objective, six definitions and maps to the appellants and Section 274 parties with a view of filing consent documents with the Environment Court by the end of May 2022.  The provisions relate to the management of coastal structures and how vessels use Northlands coastal marine area. 

·   Topic 1 (coastal activities) council staff continue to work towards agreement on how and when rules refer to mapped significant ecological and significant bird areas.

·   Topic 14 (Marine protected areas/fishing controls).  The results of a tikanga led process, including hui and wānanga in March and another planned in April are due to be reported 6 May.  The court decision it still awaited, in the absence of any all-party agreements.

·   Topic 15 (Mangroves) The court hearing that opened two years ago finally closed 5 May after legal submissions.  The court has indicated that an interim decision is likely to direct text refinements, before the final decision is made.  All parties agree it will then be the role of council to deal with the interplay between these rules and natural wetland regulations in the National Environmental Standards for Freshwater.  

·   We reported progress on appeals to the Court on 29 April.  We have requested a further reporting date of 30 June on topics 1 (Coastal activities), 6 (Damming and diverting water and land drainage), 10 (Infrastructure, energy and natural hazards) and 1A (Vehicles on beaches).  If appeals remain unresolved after 30 June, council staff will confer with parties and request that these matters be set down for a hearing.  

 

8.2.6   BIOSECURITY

INCURSION RESPONSE

Suspected wallaby sighting

A suspected sighting of a wallaby was recently reported just North of Dargaville.  A field investigation was conducted, and no further evidence was found.  It is thought the member of the public who reported it could have instead seen a large hare which are common in the area.  Further enquiries are continuing as an incursion of wallabies into Northland would place the regions forests at serious risk.

WILD ANIMAL CONTROL

Feral deer

·     Russell goat cull:  Contractors carried more goat control work at Russell using indicator dogs and preferred habit to target areas ending up with a tally of 17 goats, 15 pigs, and one sika deer.  The sika DNA has been sent to see if it matches the early DNA samples. 

·     Kaimahi training:   A kaimahi training wānanga being organized for young hunters in May.  This is a three day course will be held at the Rāwhiti marae.

·     Fallow deer release:  A release of 20 fallow deer in the Tangihua Ranges was reported.  The reported release site has been identified and the investigation is continuing with a high priority.

·     Deer farm escape:  A deer farm awaiting full Department of Conservation approval has reported sign of a deer on the outside of the wire.  The farmer has been proactive and is working with council staff to trap this animal or destroy it. 

Feral pigs

·     Feral pig report:  A large number of feral pigs were reported being seen in public areas around the Kohumaru area and staff are assisting landowners with requests for pig control. 

A large number of feral pigs have been reported in the Kohumaru area.

FRESHWATER

·     Lake Taharoa drone surveillance:  A contractor completed drone surveillance work at Lake Taharoa and did not detect any koi carp.  The drone method has a lot of potential for detecting larger koi carp in the lake with the right weather conditions and some fine tuning and calibration of the drone and operator observations.

·     Koi carp river surveillance work (outside the containment zone)Department of Conservation joined Biosecurity staff to set gill, trammel and fyke nets, alongside eDNA samplers in the Mangatete (Kaitāia) and Parapara Rivers (Taipā) looking for koi carp.  No koi or other pest species were captured in any of the nets, but lab results of eDNA samples still pending.

PARTNERSHIPS

Supply chain issues

With global supply chain disruptions arising from the COVID-19 pandemic and high seasonal demand, there have been some significant price increases from our suppliers of traps and toxins, that support much of the work delivered by our communities in collaboration with the Biosecurity Partnerships team.  The team are working through the implications of these changes of the delivery of our work programmes as further increases are expected.

Northland Regional Council – Kiwi Coast partnership

·     New projects:  With two new projects linking into Kiwi Coast over the last month (Bream Bay College Rat Patrol and Kauaepepe Landcare) there are now 202 entities linked into Kiwi Coast, managing approximately 225,640 ha.

·     2021 pest control results: The collation of the 2021 results continues.  Kiwi Coast are working with Trap.NZ to pioneer a new method to bulk download the data required into spreadsheet format from projects that use this trapping management software.  If successful, this will bring a vast increase in efficiency for this annual exercise.

·     Annual kiwi call count survey:  Preparations are underway to support the Department of Conservation led 2022 Annual Northland Kiwi Call Count Survey in late May.  Kiwi Coast is updating its purpose-built App, developing online training resources and contributing financially to the Departments publishing of the 2021 report.

Bream Bay College Rat Patrol.

·     Predator Free Whangārei support:  Kiwi Coast has continued to assist Predator Free Whangārei with boosting the 60,000 ha predator suppression zone between Te Whara/Bream Head, Whananaki, and Pukenui.  A small but significant milestone achievement has been the trapping of the first stoat in a Predator Free Whangārei funded trap, in the new network of mustelid traps installed by Kiwi Coast trapper, with Parihaka Community Landcare (full story here: https://kiwicoast.org.nz/first-stoat-caught-in-boosted-60000ha-whangarei-mustelid-control-network/).

Kiwi Link High Value Area

·     Weed control:  Kiwi Link’s coordinated Weed Action Program is now in full swing.  Monthly educational newsletters are now being sent out, and two Working Bees have been held, one hosted by Ngunguru Ford Landcare, and one by Pātaua North Landcare.  While these volunteer events will take a break over the wetter late autumn and winter months, the education campaign will continue.

·     Pest control materials:  Almost all projects involved in Kiwi Link have received further possum, rat, wasp, and plant pest control products in April in response to landowner requests for additional resources to help control pests on local properties.  Training and advice was given with each product supplied.

Whangārei Heads High Value Area

·     Weed control:  The skip bin provided to the community for moth plant pods last month has been filled and disposed of appropriately.  With up to 1000 seeds per pod the skip bin represents a huge number of potential plants removed from the Whangārei Heads area.

Whangārei Heads residents have collected thousands of moth plant pods in April.

Piroa Brynderwyn High Value Area

·     Freshwater field day:  Piroa Brynderwyns Landcare Group has partnered with Fonterra, Patuharakeke, Whitebait Connection, New Zealand Landcare Trust and Waipū Water Watch to deliver a fresh water field day.  The aim of the field day was to help local farmers and lifestyle block owners better understand the health of these catchments for native species.

 

 

Landcare Research taking eDNA samples
 from streams in the Waipū area
.

 

·     Royal New Zealand Air Force volunteer support:  Efforts to improve the Piroa/Brynderwyn High Value Area have received help from an unexpected quarter, the Royal New Zealand Air Force.   A team of ~ 25 Air Force volunteers joined other volunteers in Mangawhai for a week to cut a new section of walking trail (which may be incorporated into the Te Araroa Trail).  Biosecurity staff worked with the volunteers to install a bait station network in the adjoining Department of Conservation Reserve.  The Air Force’s help enabled the team to complete the project within just five working days and meet major milestones in conservation and recreational plans in the area that would otherwise take many months to complete.  This work will assist in securing safe corridors for kiwi to safely disperse and other rare and unique species present in the Piroa-Brynderwyn hills such as Hochstetter frogs and long tailed bats.

Biosecurity staff joined Air Force volunteers in bait station installation.

Tutukaka High Value Area

·     Predator control:  Cat and mustelid catches have now exceeded 200, whilst possum catches have generally decreased.

·     Advocacy:  A Kiwi Aversion Training event was held at Tawapou with around 30 dogs and their owners in attendance.  The event was very successful, with many of those dogs returning for refresher training exhibiting full aversion to kiwi.

·     Weed control:  The Specialist Weed Action Team have helped two significant landowners during the month with plant pest work plans; both of which have used this information to seek external funding.  Two planned weed action events were cancelled due to rain and wind. There are no further events planned until spring 2022.  The top 12 priority weeds (the “Dirty Dozen”) are being reclassified and new educational material (including our recommended control methods.

Good sense overcomes good scent as this Labrador chooses to back off when
it encounters a kiwi.

Western Northland

An online meeting was held on 3 May with Te Roroa and groups that have Community Pest Control Areas in the wider Waipoua area (eg. Kaitiaki Kiwi, Native Forest Restoration Trust, Waipoua Forest Trust, Wekaweka Landcare Group, Pūpūrangi Nature Sanctuary) as well as other key stakeholders that are also doing pest control work (eg. Department of Conservation and Forestry) or aspire for increased pest control (eg. The Waimamaku community).  Discussion covered how best to set up council funding now that there are a lot of linkages and existing collaboration between projects in this area and potential for this to grow further.  There was a consensus that a community led High Value Area was something the collective wished to pursue further and a face-to-face meeting to brainstorm the concept further is being planned.   

PREDATOR FREE

Predator Free Whangārei

Predator Free Whangārei have reached a milestone by activating devices in Working Block 1 and surrounding areas (Te Whara/Bream head, and adjacent private land at Ocean Beach).  10 possums were caught in traps over this trial period and potentially more via toxin delivery.  Surveillance cameras are showing possum activity and it is expected there are a good number in the area.

Predator Free Pēwhairangi Whānui (Bay of Islands)

The Pēwhairangi Whānui (Bay of islands) projects have also continued to progress well with draft eradication plans completed for all three peninsula and are now being critiqued by landcare groups. 

MARINE BIOSECURITY

Hull surveillance

No hulls were surveyed this month as part of the annual hull surveillance programme because of heavy rainfall creating poor visibility and contractors succumbing to COVID-19.  WorkSafe New Zealand has recommended occupational divers that have had COVID-19 do not dive for at least one month after they test positive which has added further delays to the progression of this programme.

PEST PLANTS

Community weed action

Biosecurity staff assisted Weed Action Piroa Brynderwyns with dune control work.  Species removed included pampas in the reeds, and lupins on the dunes.  This is an important ecological area for fairy terns and other shore birds.

Weed Action Piroa Brynderwyns, (left) removal of pampas seedlings growing among the native grasses,
(right) the troops walk out
.

Exclusion plants – climbing spindle-berry

A potential climbing spindle berry (Celastrus orbiculatus) infestation has been observed near an historic site of this weed in Onerahi.  Autumn is the time to find this exclusion species as the leaves turn yellow and are very visible against the green of the native bush.

Eradication plants

With the easing of COVID-19 restrictions, field inspections for eradication plants have resumed:

·     Firethorn:  Three Pyracantha potential sightings were followed up, one of which was confirmed as Pyracantha angustifolia.  Survey of surrounding bushland found no further spread.

·     Bat-wing passionflower:  Inspection of Department of Conservation reserve at Whangaroa by contractors are underway with around half the reserve completed so far.  A lot of adult bat-wing plants (more than were expected) have been removed.

·     Mickey mouse plant:  An infestation has been found in Tutukaka remote from other known sites.

A picture containing flower, plant

Description automatically generated
A stunning blaze of colour – berries of the
Firethorn (Pyracantha augustifolia) infestation.

Progressive containment plants

·     Mile a minute:   The southern regime inspections are half completed with regrowth found at all seven of the 12 sites inspected to date.

·     Pultenaea:  One site (outside containment) has been inspected and found clear of regrowth.

·     Lantana:  Two sites have been found in Tutukaka.

·     Manchurian wild rice:  April saw the start of Manuchurain wild rice aquatic sites being treated in accordance with the new Environmental Protection Agency rules.

Sustained control plants

Staff continue to work through numerous requests for advice around control and enforcement of boundary rules for sustained control species including privet and woolly nightshade.  

8.2.7   GOVERNANCE AND ENGAGEMENT

MĀORI ENGAGEMENT

Regional Workshop – Economic Development

The focus of the Te Taitokerau Māori and Council Working Party's (TTMAC) regional workshop held on 14 April was the TTMAC Strategic Intent Ngā Whainga for economic development:

·    Whai Rawa: Restore and boost tangata whenua self-reliance and self-determination. 

·    Whai Mana: Maximise economic opportunities for tangata whenua. 

·    Whai Oranga: Economic growth is compatible with the protection and enhancement of ecological, spiritual and cultural values of tangata whenua. 

The workshop opened with guest speaker, Willie Te Aho, Te Whānau ā Apanui Hapū Chair, who spoke on Te Whānau ā Apanui Vision, Aspirations and Strategic Issues and emphasised the importance of economic development initiatives ensuring the sustainability and wellbeing of the environment first and foremost. Willie outlined aspirations and options for power sharing that recognised the mana of the hapū.  He discussed the challenges experienced by hapū in their relationship with local and central government  and the importance of being able to assert tinorangatiratanga in the development of land, building of housing and working with partners to leverage of their asset base and investments.  As such Te Whānau Apanui and hapū have seen significant investment in housing and whānau, have been able to purchase/own their homes and build an economic base that has employed their own workforce, and secured central government funding to achieve this.   

Discussion followed raising important issues about asset base and the need for council to consider how hapū can build capability to manage their own resources, support kaitiaki and whānau that are currently living on their whenua, what economic data/research is available through councils to understand what this means for hapū in Te Taitokerau.

In attendance for the second item was Northland Inc Chair and director, Nicole Anderson and board member, Kris MacDonald who provided a verbal update on the progress of the development of a regional economic development strategy and a recognition that key stakeholders need to be represented in the steering group that is being formed to deliver on the vision and aspirations of Te Taitokerau, Northland: Te Ōhanga Rautaki Whānui o Te Tai Tokerau | Northland-inc - Northland, New Zealand (northlandnz.com).

Local Government Elections – Tū Mai Māori Mā

In council’s commitment to support Māori seats $20,000 was allocated in 2021/2022 for the provision of resource, support and information for iwi and hapū to engage in the local government election processes.  This directly aligns with the TTMAC strategic intent and whainga “Māori representation – Tangata Whenua are equitably represented in all council decisions and operations.”

Accordingly, a Māori media campaign has been designed with advice being provided by TTMAC tangata whenua representatives and staff.  External consultants have been engaged to provide a more nuanced approach with targeted messages for a kaupapa Māori approach including building collateral pertaining to standing for council, enrolment and voting in local government elections.  It aims to build a better understanding of the Māori and general roll so that iwi and hapū can determine make up of new constituencies, nomination processes etc.

 

The following actions are currently in progress:

·    Engagement and brief provided to Māori radio stations (Te Hiku, Ngātihine, Tautoko) to promote the local government elections and relevance for iwi and hapū in terms of Maori representation ability to influence decisions in local government.

·    Engagement of youth leaders/champions to present information at hui/marae, on radio, on social media and in te reo Māori. 

·    Provision of information for iwi and hapū hui on request to facilitate a kānohi ki te kānohi grass roots community approach on marae and in more isolated rural communities.

·    Regional local elections website updated regularly going live June with TTMAC initiatives.

·    Online webinar with TTMAC representatives facilitated by youth champions.

·    Kete of resources developed and shared end May with iwi, hapū and promoted via appropriate communications platforms.

ECONOMIC DEVELOPMENT

Investment and Growth Reserve – Projects Report

Project

Update

Future developments/ reporting

REL

Respond to NZ Insolvency and Trustee Service regarding council’s position in relation to liquidation of REL at the request of IRD.

Received formal repayment proposal from Maher Jammal.

Respond to proposal

Other Work Undertaken

Ÿ Joint Regional Economic Development Committee (JREDC) – The Joint Committee meeting took place on 29 April. Items included finalising the shareholder comment on Northland Inc’s draft SOI 2022-25 and director remuneration.

Ÿ Economic Information – Provided an update to Te Hiku Iwi Development Trust joint working party on the ‘Te Hiku Iwi’ cluster as part of Infometrics regional profile for Northland.

Ÿ Regional Projects Reserve – Revised draft criteria and procedures for the allocation of funding from this Reserve.

Ÿ CLUES scenarios and costings – Worked with the Policy Team on scenario costing, additional scenarios options and key messaging.

 

ONLINE CHANNELS

Most popular content on Facebook: Media release on the revamped section of Te Araroa trail opening in Kerikeri (posted 20 April 2022). Reaching 6,538 customers with engagement of 1,468.

*Engaged – number of people who ‘reacted’, commented or shared the post

Key Performance Indicators

Dec-21

Jan-22

Feb-22

Mar-22

Apl-22

WEB

 

 

 

 

 

# Visits to the NRC website

34,526

41,600

34,400

35,900

37,900

E-payments made

18

7

16

14

7

# subscription customers (cumulative)

NA*

1,263

1,385

1,378

1,368

SOCIAL MEDIA (cumulative)

 

 

 

 

 

# Twitter followers

1,564

1,567

1,566

1,564

1,570

# NRC Facebook fans

10,469

10,510

10,600

10,600

10,600

# NRC Overall Facebook Reach

244,777

157,700

207,200

189,900

62,700

# NRC Engaged Daily Users

4,821

2,755

4,807

8,442

3,838

# CDEM Facebook fans

26,120

26,117

26,200

26,300

26,300

# CDEM Overall Facebook Reach

NA*

214,100

171,100

103,300

111,100

# CDEM Engaged Daily Users

NA*

26,600

19,500

5,564

7,168

# Instagram followers

NA*

1,488

1,506

1,520

1,526

 

NOTES: *NA – Data not available due to Christmas break.

 

ENVIROSCHOOLS / EDUCATION

 

Enviroschools celebrations

During April, councillors joined in Enviroschools celebrations with He Kakano Early learning Centre - Bronze– and with Tangiteroria School -Silver with Chair Penny Smart officiating.

Enviroschools communities facilitated

School holidays accounted for 2 weeks of April, but Enviroschools Facilitators safely held specific interactions with 41 school and early childhood communities. 

A group of people in the woods

Description automatically generated with low confidence

 

COMMUNITY ENGAGEMENT

Communications

Communications issued in April included 5 media releases covering the following topics:  

·    Extension to deadline for environmental awards

·    Poplar and willow sales

·    Announcement of new CE

·    Opening of revamped stretch of Te Araroa Trail in Kerikeri

·    Opening of Kaipara Service Centre

 

LOCAL GOVERNMENT OFFICIAL INFORMATION (LGOIMA) REQUESTS

Total LGOIMAs

Mar 2020 to Apr 2021

Mar 2021 to Apr 2022

15

16

Number of LGOIMAs not responded to within 20 working days

0

 

 

 

CUSTOMER SERVICES

Telephone inbound call statistics and enquiries  

    

Feb 2022

Mar 2022

April

Call volume via Customer Services   

2003

2254

1847

Average wait time   

5.2 secs

7.6 secs

8.4 secs

Telephone call volume over the last three years

 

1 July 2018 –
 30 June 2019

1 July 2019 –  
 30 June 2020   

1 July 2020 –  
 30 June 2021

Call volume via Customer Services   

20,812

30,566 

31,130

Mailroom email processing performance  

  

Feb

Mar

April

Mail processed  

684

851

736

 

Six compliments and five complaints and have been received for the month of April

 

Compliments received   

Total

Biosecurity  

City Link

Total Mobility

2

3

1

Total compliments recorded  

6

 

Complaints received   

Total

City Link

Environmental Data Hub

Hotline

3

1

1

Total complaints recorded  

5

 

Four out of Five complaints have been resolved.

 

8.2.8   COMMUNITY RESILIENCE

TRANSPORT 

REGIONAL TRANSPORT PLANNING 

 

Land Transport Rule: Setting of Speed Limits Rule 

The Transport Minister recently signed off the new Land Transport Rule: Setting of Speed Limits 2022 (the Rule). The Rule will come into force on 19 May 2022, replacing the previous Land Transport Rule: Setting of Speed Limits 2017.   

 

The Rule is part of a new regulatory framework designed to improve how road controlling authorities plan for, consult on, and implement speed management changes. It is one of the tools used to support Aotearoa New Zealand’s Road to Zero Road Safety Strategy by taking an integrated speed management planning approach that considers the appropriateness of safety infrastructure, safety cameras and the setting of safe and appropriate speed limits in a combination that most effectively and efficiently moves the transport network towards a Safe System.  

The Rule:  

·           Takes a whole of network approach where decisions about safety infrastructure improvements, speed limit changes and safety camera placement are made together  

·           Requires road controlling authorities to follow a new speed management planning process to set new speed limits, shifting from a risk-based to a principles-based approach  

·           Specifies a process for preparing speed management plans as the primary means by which proposed speed limit changes are developed, shared, and certified  

·           Introduces a regional speed management planning approach on a three-year cycle that aligns with the three-year cycle of the National Land Transport Programme  

·           Transitions to lower speed limits around all schools (including kura) by 2027 (40% by 2024)  

·           Removes the requirement to set speed limits through bylaws  

·           Requires all speed limits (other than temporary speed limits) to be entered into a national register which will give legal effect to all speed limits (other than temporary speed limits)  

·           Acknowledges the status of Māori as our Treaty partners and specifies that Māori are involved in the development of speed management plans and consulted with on aspects of the plan that are important to them. 

 

Te Huringa Taraiwa: Te arotake I te pūnaha utu kaiwhakamahi rori | ‘Driving Change: Reviewing the Road User Charges System’ 

 

The Government states that the current Road User Charges (RUC) legislation is focussed on recovering the costs of damage to our road network, especially that caused by heavy vehicles, and ensuring that operators of vehicles that cause the damage pay the appropriate amount but does not recognise other costs imposed by vehicle use, such as pollution or congestion. 

 

Currently the RUC legislation provides for the setting of RUC rates to be in proportion to the costs that the vehicles generate. These costs have historically been limited only to the direct costs of damage caused by the vehicles’ use of the roads, along with the wider costs of building and maintaining the transport system. 

 

There is reported to be a growing interest in using the RUC system to also capture some of those other costs, or to offset the higher costs faced by some emerging technologies, ahead of their widespread adoption.  

The Government is progressing policies to support these outcomes by developing programmes that focus on road safety, vehicle emissions, regulatory development, and smart infrastructure investments. The RUC system could also potentially support these outcomes. 

 

The Regional Transport Committee made a submission to the proposed Te Huringa Taraiwa: Te Arotake I te Pūnaha utu Kaiwhakamahi Rori | ‘Driving Change: Reviewing the Road User Charges System’. 

 

The consultation period ended on 22 April 2022. 

 

 

 

 

 

 

 

 

 

PASSENGER TRANSPORT ADMINISTRATION 

*Bus Link figures are reported one month in arrears, due to the required information being unavailable at the time of the agenda deadline. 

Bus Link stats for March 2022 

(revenue ex GST)       

Actual      

Budget      

   

Variance    

Year/Date Actual      

   

Year/Date Budgeted     

Variance     

CityLink Passengers      

28,244 

30,085 

-1,841 

202,833 

238,751 

-35,918 

CityLink Revenue      

$30,878  

$38,810  

$7,932  

$257,269  

$307,989  

-$50,720  

Mid North Link Passengers      

168  

120  

48  

1,271  

1,368  

-97  

Mid North Link Revenue      

$621  

$600  

$21  

$4,737  

$6,140  

-$1,403  

Hokianga Link Passengers       

70  

60  

10  

664  

678  

-14  

Hokianga Link Revenue      

$375  

$417  

-$42  

$3,614  

$4,716  

-$1,102  

Far North Link Passengers       

269  

446  

-177  

2,066  

3,445  

-1,379  

Far North Link Revenue      

$593  

$1,129  

-$536  

$5,061  

$8,716  

-$3,655  

Bream Bay Link Passengers      

56  

30  

26  

392  

234  

158  

Bream Bay Link Revenue      

 $392  

$108  

$284  

$2,580  

$842  

$1,738  

Hikurangi Link Passengers      

14  

30  

-16  

177  

222  

-45  

Hikurangi Link Revenue      

$37  

$78  

-$41  

$420  

$610  

-$190  

 

National Bus Driver Shortage 

Ongoing conversations with other regional councils have shown that the bus driver shortage nationally is progressively getting worse with some councils being unable to cover all timetabled services. It is anticipated that this situation will continue to worsen over the coming months. 

 

The adverse impact on the contracted Link services in Northland is beginning to be felt. Staff remain in talks with operators on how best to manage the situation. 

The planned Whangarei urban scholar services have had to be put on hold as the operator is struggling to source drivers to cover these services. Staff will be meeting with the operator during April to address this issue going forward. 

 

Half Price Fares 

Unfortunately, there has been no noticeable increase in the number of people using the Link services during the month of April 2022.  

 

The CityLink Whangarei passenger figures for April 2022 were not available at the time of this report therefore no meaningful comparisons can be made for this service.  

 

In addition, it must be noted that the number of passengers carried in April will be lower due to school holidays and the number of public holidays observed. 

 

Rose Street Bus Terminus Upgrade 

The Rose Street upgrade is running two weeks behind schedule.  

 

Staff are struggling to find anyone to undertake the upgrade of the Rose Street Terminus office accommodation. 

 

The use of temporary stops in Vine Street has been successful to date, however since the commencement of the new school term, incidents of antisocial behavior has begun. There is an increasing number of bicycles being ridden in Vine Street and on the pavements in and around the temporary bus stops. 

 

Total Mobility (TM) 

*Total Mobility Scheme figures are reported one month in arrears, due to the required information being unavailable at the time of the agenda deadline. 

 

Total Clients 

Monthly Actual Expend 

Monthly Budgeted Expend 

Monthly Variance 

Year/Date Actual Expend 

Year/Date Budgeted Expend 

Annual Variance 

 

March 2022 

 

1,264 

$20,001 

$25,000 

-$4,999 

$172,519 

$225,000 

-$52,481 

 

Total Mobility Scheme – Far North  

NRC staff have commenced work with approved transport operators and other agencies on the implementation of the Total Mobility Scheme in Kerikeri on 1 July 2022.  

 

A budget of $75,000 for the 1-year trial has been confirmed, with the funding coming from Waka Kotahi and Far North District Council.  

 

The maximum fare allowable will be $15 per trip.  

 

ROAD SAFETY UPDATE 

Road Trauma Update 

Road Fatalities Statistics for the period 1 January 2021 – 3 May 2021  

Fatalities Jan – April 2021 

Far North 

Whangārei 

Kaipara 

Northland 

National 

Local roads 

2 

2 

1 

5 

58 

State highways 

5 

2 

2 

9 

48 

TOTAL 

7 

4 

3 

14 

106 

 

Road Fatalities Statistics for the period 1 January 2022 – 3 May 2022  

Fatalities Jan - April 2022 

Far North 

Whangārei 

Kaipara 

Northland 

National 

Local roads 

3 

2 

0 

5 

75 

State highways 

2 

2 

2 

6 

58 

TOTAL 

5 

4 

2 

11 

133 

 

 

Motorcycle Safety - Ride Forever (R4E) Rider Training Update 

·           R4E – 2020/2021 – 186 riders completed the three courses   

·           R4E – 2021/2022 – 151 riders have completed courses to date: 

o   Bronze Course – 70 

o   Silver Course – 40 

o   Gold Course – 41 

 

Northbound Driver Reviver/Fatigue Stop Easter 

A successful Driver Reviver/Fatigue Stop took place on Thursday 14 April 2022 on SH1 at Uretiti. This Stop was jointly carried out with the AMI Driver Reviver Team, Red Cross, Fit for Duty resources, supporters from Northland Road Safety Association, Ruakākā 60’s Up, Taimahi Trust, Northland Police, Northland Transportation Alliance, Northland Road Safety Trust, ACC, Waka Kotahi, Altura, and Fulton Hogan. 

 

There were approximately 300 visitors with 120 cars, trucks, caravans, camper vans etc, which stopped and enjoyed the hospitality and road safety resources.  

 

 

 

Waka Kotahi & NZ Police Road Safety Promotion/Media themes for April/May 2022 

Road safety promotional and media related themes for April/May 2022 continued to concentrate around the Road to Zero: 

 

·           Speed – Both Waka Kotahi & Northland Road Safety have had speed related radio advertisements playing across Northland radio networks. Waka Kotahi have also been running a lot of regular television advertisements as well. A new Northland safety video based on a poem written by a mid-north Fulton Hogan Road Worker maintenance crew member has been produced (link attached). This message around slowing down through road works has also been supported by radio advertisements and a Bus Back promotion with very favourable feedback. https://northlandroadsafety.co.nz/fulton-hogan-northland-road-worker-video/  

·           Safe Vehicles 

·           Alcohol/drugs  

·           Young drivers  

 

EMERGENCY MANAGEMENT 

Charges against NEMA in relation to the Whakaari White Island eruption were dismissed on 4 May 2022. WorkSafe alleged that NEMA’s functions under the CDEM Act and Plan gave rise to duties under the Health and Safety at Work Act (HSWA). They laid a charge against NEMA alleging that NEMA should have done more to influence the conduct of activities on Whakaari. 

 

NEMA’s position has been that HSWA duties do not extend to public safety functions such as civil defence emergency management and that, in any event, CDEM does not encompass regulating adventure tourism activities. The court in dismissing the charges said that the intent of the Health and Safety at Work Act (HSWA) was to regulate the workplace and workers and it was never intended to extend to the type of situations that NEMA found itself in. 

 

Work continues the Trifecta programme - NEMA's Regulatory Framework Review. Timeframes for the delivery of the bill have been extended, and a new timeline has yet to be released or confirmed. 

 

On 5 and 6 April 2022 Gary Knowles, Chief Executive Officer of the National Emergency Management Agency (NEMA) and two other support staff (Anthony Richards and Chloe Marshall) from the Agency visited Northland. They met with the new CEO (Chief Executive Officer) of Far North District Council, the Northland CDEM professionals and Victoria Harwood, the CEG (Coordinating Executive Group) chair. 

 

The purpose of the meetings was to meet with the new FNDC CEO and establish an understanding of his CDEM expectations and to discuss and understand local and regional arrangements and to provide an overview of NEMA work programmes to staff. 

 

The Northland Tsunami Siren Network was tested on Sunday 3 April 2022, the first of the twice-yearly testing regime. Most test results have been received but are yet to be finalised. There have been five reports of sirens where the lights did not flash. 

 

Work continues to progress on the Northland Tsunami Siren Network Upgrade. The project manager has identified 20 potentially suitable locations for the first 20 new sirens, to be installed in Year 1 of the programme, 14 of which will be within the Whangarei District. The next step is to gain permission from landowners (most sites are council owned land) and to engage with the individual communities.    

 

The Northland CDEM Team has been impacted by sick and bereavement leave, from COVID19, other health matters and two recent resignations. Over the past months the team has been at less than 50% of its usual work force capacity. As of 29 April 2022, an appointment to the vacant role of: Public Information Management Specialist had been made. Leaving a vacancy for a Recovery Management Specialist. Despite this a core group of people have continue to ensure that capacity exists for response and on call. 

 

Work is underway to strengthen the on-call roster with assistance for Whangarei District Council staff being more closely integrated into the operational response arrangements than has been the case in the past. 

 

Multiagency Coordination Centre the feasibility study and concept design for the Multi Agency Coordination Centre are being finalised.   Discussions have also commenced between the contributing stakeholders on the ownership model. 

 

MARITIME 

There were 12 maritime incidents reported in April. An infringement notice was issued after a collision between a yacht and an anchored powerboat in Whangārei Harbour.  

One vessel was wrecked in Tutukaka after a storm. The owners organised the clean-up of debris. Equipment from Rocket Lab trial of rocket recapture by helicopter was recovered from the sea near Mangawhai.  

 

The rest of the incidents were a mix of bylaw infringements and minor incidents. 

 

Replacement of Navigation sign panels in various locations at boat ramps in the North and maintenance work in Rangaunu Harbour was undertaken. 

 

One abandoned vessel in the Bay of Islands and two in Whangārei were removed and disposed of by maritime staff and contractors.  

 

Work on drafting the Navigational safety bylaw changes is ongoing including consultation with key parties.  

 

The Maritime team were impacted by COVID19 with two staff in Opua and one in Whangārei affected. 

 

RIVERS AND NATURAL HAZARDS 

RIVERS 

Awanui 

Favourable Autumn weather conditions and 3 contracts currently in progress (1 completed).  

Contract 21/05 - Northern Stopbanks. Approx. 70% complete. Satisfactory progress with stopbanks and benching earthworks with minimal issues. Reinstatement of first few sites now complete and prep for over-wintering of remaining sites in hand. 

Contract 21/09 - Switzer Bench. Earthworks are now 90% complete and rock revetment at rear of Bell’s Produce well underway (25%) and will progress into winter (materials supply & river levels permitting).  

Contract 21/10 - Rugby Club.  Earthworks 80% complete. Rock revetment is phased to continue into winter (materials & river levels permitting) and has the advantage that we have rock storage on hard stand, so less risk from wet weather.  

Primary School bench now 100% complete and community incredibly happy with reinstatement of Showgrounds areas. FNDC cycle path ties in very nicely with NRC reinstatement.  

Planting planned for several completed areas and local (Māori-owned) contractors being lined up for this work. 

Otīria/Moerewa 

Stage 1 work is progressing  

Kerikeri 

Waipapa Industrial Estate Flood Mitigation is approximate 55% completed. 

 

 

View of Awanui River looking upstream at Kaitaia A&P Showgrounds 

 

 

 

 

NATURAL HAZARDS     

Work Streams    

Status    

Comments    

Whangārei (CBD) River Catchment Flood Model   

70% complete 

No change from last month

Website Natural Hazards Portal   

91% complete 

No change from last month

Raupo Drainage Scheme – Coastal Flood Hazard Analysis & Mitigation Options  

85% complete 

No change from last month

Natural Hazards technical and planning support to District Councils on Plan Changes and Rules 

Ongoing 

No change from last month

Te Taitokerau Climate Adaptation Strategy (TTCAS): Professional Services Panel 

 

Ongoing 

NRC, in collaboration with and on behalf of Kaipara District Council, Whangarei District Council and Far North District Council will be going out for Request(s) for Proposal (RfPs), 6 May 2022, to establish a regional Panel of Professional Services to support the implementation of the TTCAS actions, e.g., district’s pilot projects and beyond. This will provide all four Councils with informed and preselected providers, being able to have shared services, cost, and time effective.

 

Subsequent contracts will be directly with the respective Council as per respective procurement procedures.

Closing date of submissions is 23 May 2022; assessment completion and agreement with preferred respondents will be by 7 June 2022.

 

The assessment will be completed by representatives from all four councils.

 

CLIMATE CHANGE RESPONSE 

Work Streams    

Status    

Comments    

NRC Climate Change Strategy “Ngā Taumata o te Moana” and Implementation Plan  

Implementation Ongoing 

Progress is ongoing. This Strategy touches every aspect of Council business. In undertaking a ‘stocktake’ of current actions, Staff are meeting with teams across Council to build relationships, identify current climate-related actions and areas where more could be done. Over the last month this includes discussions with the science team, land management team, CoastCare, biodiversity, corporate teams, maritime & transport teams, and communications team. This stocktake will form a baseline for work to set up a monitoring, evaluation, review, and reporting system to track our progress. 

 

The next implementation plan update will be presented to the Climate Change Working Party meeting on 25 May 2022. 

 

We are also forging ahead with engagement of Toitū to baseline our GHG emissions, certify our accounting and provide advice on where further reductions could occur. 

Te Taitokerau Climate Adaptation Strategy (TTCAS) 

Adopted by NRC 26 April 

 

All councils now adopted 

Joint Strategy now adopted by all four (4) Councils. Robust debate occurred during WDC (Whangarei District Council) and KDC meetings to adopt the Strategy. This is a significant milestone for the region and the country – this Strategy represents NZ’s first collaborative (multiple Councils and multiple tangata whenua reps) region-wide adaptation strategy.  

 

See www.catt.org.nz 

 

The release of the NZ SeaRise data on Monday 2 May generated significant media interest in the region and across the country. This provided us with a fantastic opportunity to communicate about climate adaptation mahi. 

 

Consultation on a draft National Adaptation Plan (NAP) is also underway. Given the short timeframes, the Climate Change team will be looking to influence the direction of the NAP through direct involvement on expert working groups, LGNZ fora, and the Aotearoa Climate Adaptation Network (which Tom founded and convenes). 

Te Taitokerau Climate Adaptation Strategy (TTCAS) - Programme Implementation 

Implementation Ongoing 

A foundational hui for KDC’s adaptation pilot project is being held at the hall in Ruawai on Friday 6 May 2022. This work is supported by Priority Actions 1, 2, 9, and 10 and will seek to identify ways council can support iwi/hapū led adaptation processes. 

 

The CATT forum is being used to share lessons from this pilot and inform work ongoing in other councils, and to aid KDC where required. WDC have recently hired a Climate Adaptation Coordinator to dive their adaptation programme. FNDC have not been successful in filling their advertised position. NRC will shortly go to the market to again advertise a position to support adaptation across the region. 

 

The initiation and development of a communications and engagement plan to support the Te Tai Tokerau Climate Adaptation Strategy has opened discussions about governance and identity of CATT. Interim branding work has been completed (see website above). However, a coherent governance structure with appropriate representation is missing. Staff will be working to propose and refine current arrangements over the next few months. This will be critical as we transition into the ‘doing’ part of the mahi. For example, clear arrangements (from community, government agencies, through staff, tangata whenua and Councils) will provide greater mandate to enact integrated policy changes (e.g., RPS (Regional Policy Statement) through to District Plans and building consents), identify funding and co-funding, delineate responsibilities etc.  

 

NORTHLAND WIDE LIDAR SURVEY 

Work Streams    

Status    

Comments    

Regional LiDAR Survey 

In progress 

Payment for final delivery initiated and dataset expected within 1st Quarter. 

 

8.2.9   KAIPARA MOANA REMEDIATION

Kaipara Moana Remediation (KMR) continues to make good progress in scaling up the programme, and systematising key systems and processes to support this.

As at the end of April, the KMR programme had achieved the following year-to-date milestones (see infographic), which are tracking well against our annual targets in most cases.  Our headline metric – number of Sediment Reduction Plans (SRPs) contracted  – is now at 135 SRPs (31 March 2022, i.e. at the end of Quarter 3, Year 2), compared to 90 SRPs at the end of Quarter 2, Year 2, and 61 SRPs at the end of Year 1.  The SRP pipeline is also growing, with KMR now engaging with over 222 landowners (31 March 2022).  In part, the scaling up reflects our Foundation (winter) Planting campaign now in train to ensure we can get as many trees/plants in the ground as possible over the 2022 winter.   Pleasingly, KMR’s progress was acknowledged by participants in our resumed public Zui, with last week’s Zui attended by 69 external participants from across the primary sector, local government, iwi/Māori representatives, consultancy and contractor sectors, as well as landowners in the catchment.   

 

 

 

 

Attachments/Ngā tapirihanga

Nil


Council Meeting                                                                                                                                                         item: 8.3

24 May 2022

 

TITLE:

Reporting on Long Term Plan 2021-2031 performance measures for quarter three of the 2021/22 year

From:

Robyn Broadhurst, Policy Specialist

Authorised by Group Manager/s:

Bruce Howse, Pou Taumatua – Group Manager Corporate Services, on 04 May 2022

 

Whakarāpopototanga / Executive summary

This report presents a summary of the results of council’s Long Term Plan key performance indicators for quarter three of the 2021/22 financial year, being January to March inclusive.

 

Ngā mahi tūtohutia / Recommendation

That the report ‘Reporting on Long Term Plan 2021-2031 performance measures for quarter three of the 2021/22 year’ by Robyn Broadhurst, Policy Specialist and dated 26 April 2022, be received.

 

Background/Tuhinga

The Long Term Plan 2021-2031 includes 31 key performance indicators that measure aspects of council’s service provision across three activity areas:

 

• Te Taiao | Natural environment

• Manawaroa te hapori | Community resilience

• Hautūtanga ā rohe | Regional leadership

 

Council’s Deputy Leadership Team have responsibility for analysing quarterly reporting at the end of each quarter to address any concerns, including a comprehensive analysis at the end of the financial year that will facilitate the ‘deep-dive’ by the Audit and Risk subcommittee.

 

Each performance measure provides a sample of the activity’s performance. The frequency of reporting against measures varies, with the majority being reported annually at the end of the financial year.

 

There are four performance measures that we report on quarterly. Of these four, two have achieved their targets, one has not achieved the target (however, is on track to achieving the overall yearly target), and one has achieved the target for the quarter (however, is not on track to achieving the overall yearly target). This report only provides details for those measures either not achieved, or not tracking to achievement, for quarter three:

 

Hautūtanga ā rohe | Regional leadership

3.1 Governance

Level of service

Target

Compliance

Potential impact

Potential impact to budget

Mitigation options

Percentage of official information requests that are responded to within 20 working days

100% compliance

Q1: 91.70% – not achieved

Q2: 86.70% – not achieved

Q3: 100% –achieved

Delays for customers seeking information, reputational impact

N/A

We’re looking to improve our administrative processes so that these types of errors do not occur again.

Percentage of time that elected members attend council meetings

90% compliance

Q1: 88.90% – not achieved

Q2: 97% – achieved

Q3: 88.90% – not achieved

 

Reduced quality of decision making

N/A

Non-achievement for this quarter was due to two councillors being absent – one in their capacity as a fireman and one on leave.

 

 

Attachments/Ngā tapirihanga

Nil


Council Meeting                                                                                                                                                         item: 9.1

24 May 2022

 

TITLE:

Receipt of Committee Minutes

From:

Chris Taylor, Governance Specialist

Authorised by Group Manager/s:

Chris Taylor, Governance Specialist, on 19 May 2022

 

Ngā mahi tūtohutia / Recommendation

That the unconfirmed minutes of the:

·        Kaipara Moana Remediation Joint Committee – 11 April 2022

·        Joint Regional Economic Development Committee – 29 April 2022

be received.

 

Attachments/Ngā tapirihanga

Attachment 1: Kaipara Moana Remediation Joint Committee

Attachment 2: Joint Regional Economic Development Committee   


Council Meeting  ITEM: 9.1

24 May 2022Attachment 1

PDF Creator

PDF Creator

PDF Creator

PDF Creator

PDF Creator


Council Meeting  ITEM: 9.1

24 May 2022Attachment 2

PDF Creator

PDF Creator

PDF Creator


Council Meeting                                                                                                                                                         item: 9.2

24 May 2022

 

TITLE:

Working Party Updates and Chairpersons' Briefings

From:

Sally Bowron, Strategy, Governance and Engagement Team Admin/PA

Authorised by Group Manager/s:

Auriole Ruka, Pou Manawhakahaere - GM Governance and Engagement, on date 18 May 2022

 

Ngā mahi tūtohutia / Recommendation

That the report ‘Working Party Updates and Chairpersons' Briefings’ be received.

 

Te Taitokerau Māori and Council Working Party (Co-Chairs: Councillor Robinson and Pita Tipene, Ngāti Hine)

The Te Taitokerau Māori and Council Working Party (TTMAC) met on 10 March 2022. The topics for discussion included:

·        Tangata Whenua Water Advisory Group (TW-WAG) - Terms of Reference and Remuneration    

·        Draft Freshwater 'Framework' 

·        TTMAC Strategic Intent

·        Local government review

·        Local government election 2022 - Māori representation 

·        Appointment of TTMAC representatives for Review of the Regional Policy Statement, and to sit on the Whakamānawa ā Taiao -  Environmental Awards 2022 and Tū i te Ora Scholarships judging panels       

·        Update on resource management system reform 

·        Health check update        

·        Wetland mapping.

Following discussion, the Te Taitokerau Māori and Council Working Party provided advice on the following next steps:

·        Endorsement of the Tāngata Whenua Water Advisory Group (TW-WAG) Terms of Reference to council for adoption, subject to ensuring that narrative and diagrams are aligned to clarify that TW-WAG reporting to council is via TTMAC.

·        That staff determine the process for appointing a proxy TTMAC member to
TW-WAG and then take a recommendation to council (if needed).

·        That staff continue to engage with the Māori Technical Advisory Group (MTAG) in development of the Draft Freshwater ‘Framework’ and keep TTMAC updated on progress.

·        Appointments to the following subgroups or panels:

o   Subgroup to develop a council strategic intent and implementation plan with the objective of both being endorsed by TTMAC and adopted by council

o   The Future for Local Government review panel subgroup

o   The Regional Policy Statement subgroup

o   Te Tiriti Health Check Advisory Group subgroup

o   The Tū i te Ora Scholarships selection panel

o   The Whakamānawa ā Taiao - Environmental Awards 2022 judging panel

·        For TTMAC to be updated on progress of mapping under the National Policy Statement for Freshwater Management 2020 (NPS-FM).

·        That staff provide an improved plan and progress report, so MTAG are able to report progress in a meaningful way to the formal meeting.

 

Joint WDC-NRC Whangārei Public Transport Working Party (Cr. Terry Archer)

The Joint WDC-NRC Whangārei Public Transport Working Party met on 5 April 2022. The topics for discussion included:

·        Government Half-Fares for Public Transport

·        Whangārei District – Link Bus Services Update February 2022

·        Rose Street Bus Terminal Upgrade

Following discussion, the Joint WDC-NRC Whangārei Public Transport Working Party provided advice on the following next steps:

·        NTA staff are to send Councillor Murphy the T2 Lane Business Case / Feasibility Study.

·        NTA staff are to discuss with Waka Kotahi the frequency of bus service and whether to increase.

·        NTA staff are to write a report regarding the decision to employ a bus station staff member; role, duties, safety etc.

 

 


Council Meeting                                                                                                                                                         item: 9.3

24 May 2022

 

TITLE:

Taumarere Flood Management Working Group Update

From:

Erica Wade, Personal Assistant - Environmental Services

Authorised by Group Manager/s:

Victoria Harwood, Pou Tiaki Hapori - GM Community Resilience, on date 11 May 2022

 

Ngā mahi tūtohutia / Recommendation

That the report ‘Taumarere Flood Management Working Group Update’ be received.

 

Taumarere Flood Management Working Group (Chair: Cr. Blaikie)

The Taumarere Flood Management Working Group met on 30 April 2022. The topics for discussion included:

·        Cultural Assessment

·        Rubbish Clean-up

·        Spillway and Bridge update

·        Waiomio Update

·        Budget

·        AFFCO pond consents and dam inspection

Following discussion, the Taumarere Flood Management Working Group provided advice on the following next steps:

·        NRC to gather information regarding hapu & council partnership in water testing.

·        Waka Kotahi, NTA (Northland Transportation Alliance) and NRC to discuss initiatives like the community rubbish day in Otiria.

·        NRC to speak with FNDC regarding maintenance schedules of swales.

·        NRC to investigate consents around the AFFCO settlement ponds

·        NRC to request AFFCO Dam report

   


Council Meeting                                                                                                                                                        ITEM: 10.0

24 May 2022

 

TITLE:

Business with the Public Excluded

 

Whakarāpopototanga / Executive Summary

The purpose of this report is to recommend that the public be excluded from the proceedings of this meeting to consider the confidential matters detailed below for the reasons given.

Ngā mahi tūtohutia / Recommendations

1.              That the public be excluded from the proceedings of this meeting to consider confidential matters.

2.              That the general subject of the matters to be considered whilst the public is excluded, the reasons for passing this resolution in relation to this matter, and the specific grounds under the Local Government Official Information and Meetings Act 1987 for the passing of this resolution, are as follows:

Item No.

Item Issue

Reasons/Grounds

10.1

Confirmation of Confidential Minutes - Council Meeting 26 April 2022

The public conduct of the proceedings would be likely to result in disclosure of information, as stated in the open section of the meeting -.

10.2

Receipt of Committee CONFIDENTIAL Minutes

The public conduct of the proceedings would be likely to result in disclosure of information, as stated in the open section of the meeting -.

3.              That the Independent Financial Advisors be permitted to stay during business with the public excluded.

Considerations

1.    Options

Not applicable. This is an administrative procedure.

2.    Significance and Engagement

This is a procedural matter required by law. Hence when assessed against council policy is deemed to be of low significance.

3.    Policy and Legislative Compliance

The report complies with the provisions to exclude the public from the whole or any part of the proceedings of any meeting as detailed in sections 47 and 48 of the Local Government Official Information Act 1987.

4.    Other Considerations

Being a purely administrative matter; Community Views, Māori Impact Statement, Financial Implications, and Implementation Issues are not applicable.